SUPREME
COURT OF CANADA
Citation:
Teal Cedar Products Ltd. v. British Columbia, 2017 SCC 32
|
Appeal Heard:
November 1, 2016
Judgment Rendered:
June 22, 2017
Docket:
36595
|
Between:
Teal
Cedar Products Ltd.
Appellant
and
Her
Majesty the Queen in Right of the Province of British Columbia
Respondent
And
Between:
Teal
Cedar Products Ltd.
Appellant
and
Her
Majesty the Queen in Right of the Province of British Columbia
Respondent
Coram: McLachlin C.J. and Abella, Moldaver, Karakatsanis, Wagner,
Gascon, Côté, Brown and Rowe JJ.
Reasons for
Judgment:
(paras. 1 to 103)
|
Gascon J. (McLachlin C.J. and Abella, Karakatsanis and
Wagner JJ. concurring)
|
Joint Reasons
Dissenting in Part:
(paras. 104 to 139)
|
Moldaver and Côté JJ. (Brown and Rowe JJ. concurring)
|
Note: This document is subject to editorial revision before its
reproduction in final form in the Canada Supreme Court Reports.
teal cedar products ltd. v. british
columbia
Teal Cedar Products Ltd. Appellant
v.
Her Majesty the Queen in Right of the
Province of British Columbia Respondent
‑ and ‑
Teal Cedar Products Ltd. Appellant
v.
Her Majesty the Queen in Right of the
Province of British Columbia Respondent
Indexed as: Teal Cedar Products
Ltd. v. British Columbia
2017 SCC 32
File No.: 36595.
2016: November 1; 2017: June 22.
Present: McLachlin C.J. and Abella, Moldaver, Karakatsanis,
Wagner, Gascon, Côté, Brown and Rowe JJ.
on appeal from the court of appeal for british columbia
Arbitration — Appeals — Jurisdiction
— Standard of review — Commercial arbitration awards — Province reducing forestry company’s access to improvements on Crown
land used to harvest timber — Parties disagreeing as to amount of compensation
owed to forestry company and entering into arbitration — Leave to appeal award
sought by parties pursuant to s. 31(2) of the Arbitration Act — Appeal of
award dismissed in part but dismissal reversed by Court of Appeal — Whether
Court of Appeal erred in construing issues decided by arbitrator as questions
of law subject to appellate review — Arbitration Act, R.S.B.C.
1996, c. 55, s. 31.
Contracts
— Interpretation — Use of factual matrix — Province reducing
forestry company’s access to improvements on Crown land used to harvest timber —
Parties entering into agreement to negotiate compensation owed to forestry
company for loss of access to improvements — Agreement precluding payment of
interest as part of compensation — Parties disagreeing as to amount of
compensation and entering into arbitration — Whether legal question arises from
arbitrator’s contractual interpretation of forestry company’s entitlement to
interest.
Natural
resources — Forests — Permits and licences — Province reducing
forestry company’s access to improvements on Crown land used to harvest timber —
Parties disagreeing as to amount of compensation owed to forestry company and
entering into arbitration — Whether arbitrator’s conclusion that forestry
company’s losses may be valued on basis of depreciation replacement cost method
was reasonable — Forestry Revitalization Act, S.B.C. 2003, c. 17, s. 6(4).
T, a
forestry company, holds licences to harvest Crown timber in the province of
British Columbia. When the province reduced the volume of T’s allowable harvest
and deleted certain areas from the related Crown land base, the parties were
unable to settle how much compensation the province owed to T for reducing the
latter’s access to certain improvements such as roads and bridges which T used
to harvest the timber. Consequently, their dispute was submitted to arbitration
in accordance with the Forestry Revitalization Act (“Revitalization
Act”). The arbitrator was seized of an issue of statutory interpretation to
determine the proper valuation method for the improvements pursuant to the Revitalization
Act, which he found to be the depreciation replacement cost method. The
arbitrator also ruled on an issue of contractual interpretation, concluding
that an agreement reached by the parties prior to arbitration did not exclude
interest from the province’s payment of compensation to T for the improvements.
Finally, on an issue of statutory application, the arbitrator determined that T
was not entitled to compensation for the improvements to which it did not lose
access. On appeal, the application judge upheld the arbitrator’s award
except in connection with the statutory application issue, which was remitted
to the arbitrator and resulted in an additional award in an amount equal to the
value of the improvements. A majority of the Court of Appeal reversed the
application judge’s decision, finding that the arbitrator had erred on both the
statutory interpretation and contractual interpretation issues, as well as in
making his subsequent ruling regarding the statutory application issue. On
remand for disposition in accordance with Sattva Capital Corp. v. Creston
Moly Corp., 2014 SCC 53, [2014] 2 S.C.R. 633, a unanimous Court of Appeal
held that its disposition of the appeal was unaltered by Sattva,
reaffirming its conclusion that the issues ruled upon by the arbitrator are
questions of law subject to appellate review, and that the arbitrator was in
error regardless of the standard of review applied.
Held (Moldaver,
Côté, Brown and Rowe JJ. dissenting in part): The appeal is allowed in part.
Per
McLachlin C.J. and Abella, Karakatsanis, Wagner and
Gascon JJ.: The Court of Appeal’s decision on remand
cannot stand in light of Sattva. The process for characterizing a
question as one of three principal types — legal, factual, or mixed — is well‑established,
as confirmed in Sattva: legal questions are questions about what the
correct legal test is; factual questions are questions about what actually took
place between the parties; and mixed questions are questions about whether the
facts satisfy the legal test. While the application of a legal test to a set of
facts is a mixed question, if, in the course of that application, the
underlying legal test may have been altered, then a legal question arises. Such
a legal question, if alleged in the context of a dispute under the Arbitration
Act, and assuming the other jurisdictional requirements of that Act are
met, is open to appellate review. These extricable questions of law are better
understood as a covert form of legal question — where a judge’s (or
arbitrator’s) legal test is implicit to their application of the test rather
than explicit in their description of the test — than as a fourth and distinct
category of questions.
Courts
should, however, exercise caution in identifying extricable questions of law
because mixed questions, by definition, involve aspects of law. The motivations
for counsel to strategically frame a mixed question as a legal question — for
example, to gain jurisdiction in appeals from arbitration awards or a
favourable standard of review in appeals from civil litigation judgments — are
transparent. A narrow scope for extricable questions of law is consistent with
finality in commercial arbitration and, more broadly, with deference to factual
findings. Courts must be vigilant in distinguishing between a party alleging
that a legal test may have been altered in the course of its application (an
extricable question of law), and a party alleging that a legal test, which was
unaltered, should have, when applied, resulted in a different outcome (a mixed
question).
The
characterization of a question on review as a mixed question rather than as a
legal question has vastly different consequences in appeals from arbitration
awards and civil litigation judgments. The identification of a mixed question
when appealing an arbitration award defeats a court’s appellate review jurisdiction
under the Arbitration Act. In contrast, the identification of a mixed
question when appealing a civil litigation judgment merely raises the standard
of review.
Given
these principles as confirmed in Sattva, a question of statutory
interpretation is normally characterized as a legal question. In contrast,
identifying a question, broadly, as one of contractual interpretation does not
necessarily resolve the nature of the question at issue. Contractual
interpretation involves factual, legal, and mixed questions, and characterizing
the nature of the specific question before the court requires delicate
consideration of the narrow issue actually in dispute. In general, contractual
interpretation remains a mixed question, not a legal question, as it involves
applying contractual law (principles of contract law) to contractual
facts (the contract itself and its factual matrix).
In
the present case, the statutory interpretation issue, i.e. the issue of
selecting a valuation method that complies with the Revitalization Act,
involves two types of questions: (1) questions about the broad category of
methods that are acceptable under the terms of the Revitalization Act;
and (2) questions about the specific method, within that broad category of
acceptable methods, that should ultimately be applied. The former questions —
the methods that are acceptable under the Revitalization Act — are a
matter of statutory interpretation and, accordingly, are questions of law. As a
result, the courts have jurisdiction to review the arbitrator’s resolution of
the issue in so far as that resolution involves identifying a pool of
methodologies consistent with the Revitalization Act.
The
latter questions — the preferable method among those that are consistent with
the Revitalization Act — are inextricably linked to the evidentiary
record at the arbitration hearing, where various experts opined on the virtues
of conflicting valuation methodologies. They are mixed questions, if not pure
questions of fact. Therefore, the courts lack jurisdiction to review the
arbitrator’s selection of a specific methodology among the pool of
methodologies which are consistent with the Revitalization Act.
As
for the contractual interpretation issue, the courts have no jurisdiction to
review the arbitrator’s decision in this regard. The arbitrator, after a
lengthy and complex hearing, was best situated to weigh the factual matrix in
his interpretation of the parties’ agreement regarding the payment of interest.
The fact that he may have placed significant weight on that evidence in
interpreting the agreement does not engage a legal question conferring
jurisdiction on the courts under the Arbitration Act as it does not
alter the underlying test he applied in this case. Further, the arbitrator’s
interpretation was rooted in the words of the contract, not overwhelmed by
them. While the arbitrator may have placed significant weight on the factual
matrix when interpreting the meaning of “compensation”, there is no arguable
merit to the claim that he interpreted that matrix isolated from the contract’s
words so as to effectively create a new agreement.
Likewise,
on the statutory application issue, the courts have no jurisdiction to review
the arbitrator’s decision in this regard. The question implicated — whether the
arbitrator correctly applied the valuation methodology to a licence — is a
mixed question. As such, it is beyond the scope of appellate review.
It
follows that the courts’ jurisdiction is limited to the statutory
interpretation issue of identifying a pool of methodologies consistent with the
Revitalization Act. The decision made on this issue was rendered in an
arbitral context pursuant to the Arbitration Act. As confirmed in Sattva,
the standard of review on legal questions arising from the arbitrator’s
analysis of this statutory interpretation issue is reasonableness, which is
almost always the applicable standard when reviewing commercial arbitration
awards. This preference for a reasonableness standard dovetails with the key
policy objectives of commercial arbitration, namely efficiency and finality. And
this preference is not negated here in light of the nature of the question at
issue and the arbitrator’s presumed expertise.
It
would be an error to claim that all statutory interpretation by an arbitrator
demands correctness review simply because it engages a legal question. In
contrast, where the decision under review is, for example, a civil litigation
judgment, the nature of the question is dispositive of the standard of review,
with factual and mixed questions being reviewed for palpable and overriding
error and legal questions — including extricable questions of law — being
reviewed for correctness. It is therefore critical to bear these distinctions
in mind when determining the appropriate standard of review in any given case.
The
Court of Appeal erroneously held that the standard of review should be
correctness for the statutory interpretation issue. Its decision appears to
suggest that questions of law, such as statutory interpretation, necessarily
attract a correctness standard of review. In so far as the Court of Appeal
intended to make this suggestion, it is incorrect. While the nature of the
question (legal, mixed, or fact) is dispositive of the standard of review in
the civil litigation context, it is not in the arbitration context.
With
respect to the review step of the analysis, the arbitrator’s determination that
the depreciation replacement cost method was consistent with the Revitalization
Act was reasonable. This decision fell within a range of possible,
acceptable outcomes which were defensible in respect of the facts and law, and
the decision was justified, transparent, intelligible, and defensible. The
claim that this method results in a windfall begs the question, i.e. it assumes
that compensation equal to the value of all improvements is excessive in the
course of explaining that excess. And the basis for claiming that excessive
compensation was paid in this case is the assumption that it was inappropriate
for the arbitrator to order compensation in excess of T’s actual costs, despite
the absence of any reference in the Revitalization Act limiting T’s
compensation to its actual costs or expenses. The full “value of improvements
made to Crown land” is the language chosen by the legislature as the quantum
for the compensation provision. If the provincial legislature had wanted to pay
companies less than the “value of improvements made to Crown land”, it would
not have set the amount of compensation “equal to” it. As a consequence, the
arbitrator’s reasoning is hardly indefensible, particularly when the wording of
the compensation provision so clearly fixes compensation at the specific amount
chosen by the arbitrator. In the end, the legislature is entitled to provide
forestry companies with statutory compensation that is not quantified on the
basis of the nature of their interests in the Crown land at issue and the
arbitrator’s interpretation of the compensation provision is accordingly
entitled to deference.
Per
Moldaver, Côté, Brown and Rowe JJ. (dissenting in part): Regardless of the applicable standard of review, the arbitrator’s
interpretation of s. 6(4) of the Revitalization Act cannot stand. The
only interpretation of s. 6(4) that withstands scrutiny on either standard
of review is that T, as a licence holder, was entitled to receive compensation
only for its limited interest in the improvements. In valuing the improvements
under s. 6(4), the arbitrator was required to take into account that T, as
a licence holder, did not own the improvements, which belonged to the Crown.
The
plain and ordinary meaning of s. 6(4) is that T is entitled to be
compensated on a basis that reflects its limited interest in the improvements
as a licence holder. This plain meaning of s. 6(4) is consistent with the
purpose of the Revitalization Act and its expropriation context. The Revitalization
Act’s purpose is to reduce the rights of licence holders — specifically,
their rights to harvest timber and use the improvements — and to provide
licence holders with compensation for these reductions. As a result of the
takebacks at issue, reductions were made to T’s rights to use the improvements
— not ownership rights over such improvements. It runs counter to the purpose
of the Revitalization Act to award T compensation that exceeds the value
of what it lost due to the takebacks.
The
cost savings approach applied by the arbitrator may be an appropriate
methodology in the context of privately owned land. But the roads and bridges
at issue in this case belonged to the Crown. Given that T did not own the
improvements and had only a limited interest in the improvements as a licence
holder, it cannot be said that it lost the replacement cost of the improvements
when the province made reductions to the land base under its licences, nor can
it be said that T would pay the full cost to replace the network of
improvements at issue.
The
arbitrator construed s. 6(4) of the Revitalization Act too narrowly
in concluding that the distinction drawn by this provision between the value of
the improvements and the value of the harvesting rights means that the market
value of the tenure as a whole cannot be considered when determining the value
of the improvements. There is nothing in the language or context of the Act to
support this unduly restrictive reading of s. 6(4). On the contrary, it
was open to the arbitrator to select any valuation method that could evaluate
the value of the improvements to T as a licence holder, as long as the approach
valued the improvements as separate and distinct from the harvesting rights.
The
market value method was available to the arbitrator under s. 6(4) of the Revitalization
Act, and yet the arbitrator chose to apply a method that was inconsistent
with this provision. This resulted in a substantial windfall for T. The matter
of compensation for the improvements relating to the three licences at issue
should accordingly be remitted to the arbitrator for reconsideration.
Cases Cited
By Gascon J.
Applied:
Sattva Capital Corp. v. Creston Moly Corp., 2014 SCC 53, [2014] 2 S.C.R.
633; referred to: Canada (Director of Investigation and Research) v.
Southam Inc., [1997] 1 S.C.R. 748; Housen v. Nikolaisen, 2002 SCC
33, [2002] 2 S.C.R. 235; Heritage Capital Corp. v. Equitable Trust Co.,
2016 SCC 19, [2016] 1 S.C.R. 306; Canadian National Railway Co. v. Canada (Attorney
General), 2014 SCC 40, [2014] 2 S.C.R. 135; Ledcor Construction Ltd. v.
Northbridge Indemnity Insurance Co., 2016 SCC 37, [2016] 2 S.C.R. 23; Hayes
Forest Services Ltd. v. Weyerhaeuser Co., 2008 BCCA 31, 289 D.L.R. (4th)
230; Glaswegian Enterprises Inc. v. B.C. Tel Mobility Cellular Inc.
(1997), 101 B.C.A.C. 62; Black Swan Gold Mines Ltd. v. Goldbelt Resources Ltd.
(1996), 78 B.C.A.C. 193; Dunsmuir v. New Brunswick, 2008 SCC 9, [2008] 1
S.C.R. 190; McLean v. British Columbia (Securities Commission), 2013 SCC
67, [2013] 3 S.C.R. 895; Catalyst Paper Corp. v. North Cowichan
(District), 2012 SCC 2, [2012] 1 S.C.R. 5; Canada (Citizenship and
Immigration) v. Khosa, 2009 SCC 12, [2009] 1 S.C.R. 339; Toronto Area
Transit Operating Authority v. Dell Holdings Ltd., [1997] 1 S.C.R. 32; Wilson
v. Atomic Energy of Canada Ltd., 2016 SCC 29, [2016] 1 S.C.R. 770.
By Moldaver and Côté JJ.
(dissenting in part)
CanadianOxy
Chemicals Ltd. v. Canada (Attorney General), [1999] 1 S.C.R. 743; Rizzo
& Rizzo Shoes Ltd. (Re), [1998] 1 S.C.R. 27; Canadian Pacific Air
Lines Ltd. v. Canadian Air Line Pilots Assn., [1993] 3 S.C.R. 724; British
Columbia (Forests) v. Teal Cedar Products Ltd., 2013 SCC 51, [2013] 3
S.C.R. 301; Smith v. Alliance Pipeline Ltd., 2011 SCC 7, [2011] 1 S.C.R.
160; Diggon‑Hibben, Ltd. v. The King, [1949] S.C.R. 712; MacMillan
Bloedel Ltd. v. British Columbia (1995), 12 B.C.L.R. (3d) 134.
Statutes and Regulations Cited
Arbitration Act, R.S.B.C. 1996, c. 55,
s. 31.
Forest Act, R.S.B.C. 1996, c. 157.
Forest Planning and Practices Regulation,
B.C. Reg. 14/2004, s. 79(2).
Forestry Revitalization Act, S.B.C. 2003,
c. 17, ss. 6, 13.
Authors Cited
British Columbia. Legislative Assembly. Official Report of
Debates of the Legislative Assembly (Hansard), vol. 13, No. 6,
4th Sess., 37th Parl., March 27, 2003, p. 5682.
Driedger, Elmer A. Construction of Statutes, 2nd ed. Toronto:
Butterworths, 1983.
Hall, Geoff R. Canadian Contractual Interpretation Law,
3rd ed. Toronto: LexisNexis, 2016.
Mullan, David. “Unresolved Issues on Standard of Review in Canadian
Judicial Review of Administrative Action — The Top Fifteen!” (2013), 42 Adv.
Q. 1.
Shorter Oxford English Dictionary on Historical Principles, 6th ed. by Angus Stevenson. Oxford: Oxford University Press, 2007,
“compensation”.
Todd, Eric C. E. The Law of Expropriation and
Compensation in Canada, 2nd ed. Scarborough, Ont.: Carswell, 1992.
APPEAL
from a judgment of the British Columbia Court of Appeal (Lowry, Chiasson and
MacKenzie JJ.A.), 2015 BCCA 263, 70 B.C.L.R. (5th) 320, 373 B.C.A.C. 211,
641 W.A.C. 211, 386 D.L.R. (4th) 40, 115 L.C.R. 1, [2015] B.C.J. No. 1180
(QL), 2015 CarswellBC 1550 (WL Can.), affirming on remand a judgment of the
British Columbia Court of Appeal (Finch C.J. and Lowry and MacKenzie JJ.A.),
2013 BCCA 326, 46 B.C.L.R. (5th) 272, 340 B.C.A.C. 256, 579 W.A.C. 256, 364
D.L.R. (4th) 465, 109 L.C.R. 276, [2013] B.C.J. No. 1480 (QL), 2013
CarswellBC 2059 (WL Can.), setting aside a decision of Bauman C.J., 2012
BCSC 543, [2012] B.C.J. No. 735 (QL), 2012 CarswellBC 1054 (WL Can.),
which partially upheld an arbitrator’s decision. Appeal allowed in part,
Moldaver, Côté, Brown and Rowe JJ. dissenting in part.
John J. L. Hunter, Q.C., Mark S. Oulton and K. Michael Stephens, for the appellant.
Karen A. Horsman, Q.C., Barbara A. Carmichael and Micah Weintraub, for the respondent.
The judgment of McLachlin C.J. and Abella,
Karakatsanis, Wagner and Gascon JJ. was delivered by
Gascon J. —
I.
Overview
[1]
In British Columbia, the scope of appellate intervention
in commercial arbitration is narrow in two key ways. First, there is limited
jurisdiction for appellate review of arbitration awards because that
jurisdiction is statutorily limited to questions of law (Arbitration Act,
R.S.B.C. 1996, c. 55, s. 31). Second, even where such
jurisdiction exists, our Court recently held that a deferential standard of
review — reasonableness — “almost always” applies to arbitration awards (Sattva
Capital Corp. v. Creston Moly Corp., 2014 SCC 53, [2014] 2 S.C.R. 633, at
paras. 75, 104 and 106). Together, limited jurisdiction and deferential review
advance the central aims of commercial arbitration: efficiency and finality.
[2]
The Province of British Columbia (“BC”) and a
forestry company, Teal Cedar Products Ltd. (“Teal Cedar”), were unable to
settle how much compensation BC owed to Teal Cedar for reducing the latter’s
access to certain improvements on Crown land — such as roads and bridges —
which it used to harvest timber. Consequently, their dispute was submitted to arbitration
as required by the applicable legislation, the Forestry Revitalization Act,
S.B.C. 2003, c. 17 (“Revitalization Act”). Teal Cedar, for the
most part, won. Three questions arising from the arbitrator’s award are the
subject of this appeal.
[3]
First, there is a question of statutory
interpretation: whether the arbitrator erred in selecting a valuation method
that was allegedly inconsistent with the section of the Revitalization Act
providing Teal Cedar with compensation. In my opinion, this is a question of
law falling within the scope of appellate review permitted under the Arbitration
Act. However, the arbitrator, who relied on the plain meaning of the
statute prescribing that valuation, reasonably selected a suitable valuation
method. Accordingly, I find that his award in this regard cannot be overturned.
[4]
Second, there is a question of contractual
interpretation: whether the arbitrator let the factual matrix overwhelm the
words of the contract when he interpreted an amended settlement agreement between
the parties in light of the factual matrix of their failed negotiations. This
question may be formulated in two ways: (1) whether the arbitrator allocated
excessive weight to the factual matrix; or (2) whether the arbitrator’s
interpretation of the factual matrix was isolated from the words of the
contract. The former formulation is a question of mixed fact and law and thus
falls outside the scope of appellate review permitted under the Arbitration
Act. The latter formulation, while it raises a question of law, lacks
arguable merit in this case because the arbitrator’s interpretation was clearly
anchored in the words of the contract, which he interpreted in light of the
factual matrix. Without arguable merit, this formulation also fails to confer
appellate review jurisdiction under the Arbitration Act.
[5]
Third, there is a question of statutory
application: whether the arbitrator erred in denying compensation to Teal
Cedar relating to the improvements associated with one of its licences because
it never lost access to those improvements, in contrast with the other licences
where it lost such access. Teal Cedar’s licence for that area is referred to
in these reasons as the Lillooet Licence. This question involves the
application of a specific valuation methodology to the intricate facts before
the arbitrator, which qualitatively distinguished the Lillooet Licence from the
other licences in dispute. On that basis, I consider that this a question of
mixed fact and law outside the scope of appellate review permitted under the Arbitration
Act.
[6]
As the Court of Appeal below reached the
opposite conclusion on the first two questions, I would allow the appeal in
part. Like the application judge, I would confirm the arbitrator’s award on
these two questions. However, on the third question, like the Court of Appeal
this time, I would restore the arbitrator’s original ruling that BC owed Teal
Cedar no compensation relating to improvements for the Lillooet Licence.
II.
Context
A.
The Timber Licences and the Revitalization Act
[7]
In British Columbia, forestry companies hold
licences which regulate how those companies may harvest Crown timber. The
appellant, Teal Cedar, is one such forestry company. Three of Teal Cedar’s
licences are relevant to the current dispute, namely: (1) Forest Licence A19201
in the Fraser Timber Supply Area; (2) Tree Farm Licence 46 located on Vancouver
Island; and (3) Forest Licence A18699 in the Lillooet Timber Supply Area (the
“Lillooet Licence”). In general terms, these licences entitle Teal Cedar to harvest
timber and to use improvements, such as roads and bridges, to access timber.
[8]
In 2003, the respondent, BC, enacted the Revitalization
Act. This Act changed forestry companies’ rights under their licences by
deleting areas from their land base and reducing the volume of their allowable
harvest. In particular, Teal Cedar’s licences were affected as follows:
(a) The Fraser Timber Supply Area licence’s allowable harvest was
reduced by 37,500 cubic metres and many of Teal Cedar’s chart areas were
removed from the associated land base.
(b) The Vancouver Island licence’s allowable harvest was reduced by
130,637 cubic metres and many of Teal Cedar’s operating areas were removed from
the associated land base.
(c) The Lillooet Licence’s allowable harvest was reduced by 48,078 cubic
metres, but, unlike the other two licences, this licence never lost any areas
in its associated land base.
[9]
In response to these changes, the Revitalization
Act provided compensation to forestry companies. The amount of that
statutory compensation is at the heart of the dispute between BC and Teal
Cedar. The relevant compensation provision is s. 6 and, in particular,
subs. (4), which provides forestry companies with “compensation from the
government in an amount equal to the value of improvements made to Crown land”:
Compensation
6 (1) Each holder of an ungrouped
licence is entitled to compensation from the government for a reduction under
section 2 (1) of the allowable annual cut of the ungrouped licence, in an
amount equal to the value, for the unexpired portion of the term of the
licence, of the harvesting rights taken by means of the reduction.
(2) Each holder of a timber licence is entitled to compensation from
the government in respect of the part, if any, of a reduction in the area of
Crown land described in the timber licence that is made under section 2 (2) and
that is attributed under section 3 (1) to that licence in an amount equal to
the value of the harvesting rights taken by means of the reduction.
(3) Each holder of a licence in a group of licences is entitled to
compensation from the government in respect of the part, if any, of a reduction
of the allowable annual cut of the licence that is made under section 2 (3) and
that is attributed under section 3 (2) to that licence, in an amount equal to
the value, for the unexpired portion of the term of the licence, of the
harvesting rights taken by means of the reduction.
(4) In addition to the compensation to which the holder of an
ungrouped licence, a timber licence or a licence in a group of licences is
entitled under subsection (1), (2) or (3), the holder is entitled to
compensation from the government in an amount equal to the value of
improvements made to Crown land that
(a)
are, or have been, authorized by the government,
(b) are not improvements to which section 174 of the Forest
Practices Code of British Columbia Act applies, and
(c) are not, or have not been, paid for by the
government under the Forest Act or the former Act as defined in the Forest
Act.
(4.1) Subsection (4) also applies to a holder of a tree farm licence
that is subject to a deletion of Crown land from the tree farm licence area
under section 39.1 of the Forest Act, if the deletion
(a)
is in respect of a reduction of allowable annual cut under section 3 (3) of
this Act, and
(b)
is made before the date this subsection comes into force.
(5) An entitlement to compensation under this section vests in the
holder to which it applies on March 31, 2003.
(6) A dispute between the minister and the holder of an ungrouped
licence, a timber licence or a licence in a group of licences as to the amount
of the compensation to which the holder is entitled under this section must be
submitted to arbitration under the Arbitration Act.
[10]
Conceptually, s. 6 provides for two types of
compensation, namely compensation for: (1) reductions to harvesting rights
(“Rights Compensation”, provided for in subss. (1) to (3)); and (2) the value of improvements made to Crown
land (“Improvements Compensation”, provided for in s. 6(4)).
[11]
The Revitalization Act permits the
Lieutenant Governor in Council to make regulations concerning, among other
things, this compensation provision:
Regulations
13 (1) The Lieutenant Governor in Council may make regulations
referred to in section 41 of the Interpretation Act.
(2)
Without limiting subsection (1), the Lieutenant Governor in Council may make
regulations
(a)
defining a word or expression not otherwise defined in this Act, and
(b)
for the purposes of section 6, prescribing respecting value, including but
not limited to
(i)
determining value and defining the components that comprise value,
(ii)
prescribing methods of evaluation for use in determining value,
(iii) prescribing factors to be taken into account in an evaluation,
(iv)
defining the role of evaluators in a determination of value and prescribing
qualifications for evaluators that are prerequisite to their participation in
the determination of value, and
(v)
prescribing requirements for the selection of arbitrators.
Accordingly, while s. 6(4) of the Revitalization
Act provides for Improvements Compensation “in an amount equal to the value
of improvements made to Crown land”, s. 13(2)(b)(ii) anticipates regulations
“prescribing methods of evaluation for use in determining” that value. However,
neither at the time of the dispute nor at the time of the hearing before this
Court had any regulations been passed prescribing those valuation methods.
[12]
Lastly, in terms of process, s. 6(6) of the Revitalization
Act provides that disputes relating to the amount of compensation BC owes
to a forestry company must be submitted to arbitration. Again, the Revitalization
Act permits the Lieutenant Governor in Council to make regulations
“prescribing requirements for the selection of arbitrators” (s. 13(2)(b)(v)).
As with the anticipated regulations concerning valuation methods, neither at
the time of the dispute nor at the time of the hearing before this Court had
any regulations been passed prescribing arbitrator selection requirements.
Consequently, up until the time of the hearing before this Court, arbitrations
regarding compensation under the Revitalization Act were presided over
by arbitrators chosen by consent of the parties. There was no list of
arbitrators limiting party autonomy in this respect.
B.
The Dispute Between Teal Cedar and British
Columbia
[13]
Teal Cedar suffered compensable losses under the
Revitalization Act. It negotiated the value of those losses with BC and
the parties reached a partial settlement. They were able to settle the value of
the Rights Compensation owed to Teal Cedar, but they were unable to settle the
value of the Improvements Compensation.
[14]
To confirm their partial settlement and provide
guidelines for their ongoing negotiations, the parties executed a Settlement
Framework Agreement. That agreement contained a “No Interest Clause”, which
precluded interest payments to Teal Cedar:
No interest shall be payable
by [BC] in respect to this or any other compensation that may be due to [Teal
Cedar] under the [Revitalization Act].
(A.R., vol. I, at p. 225)
[15]
Negotiations about the value of the Improvements
Compensation were ultimately unsuccessful. Accordingly, 10 months after the
Settlement Framework Agreement was first executed, the parties signed an
amendment to that agreement (the “Amendment”), resulting in a new agreement
combining the Settlement Framework Agreement with the Amendment (the “Amended
Agreement”). The Amended Agreement provided that the parties were unable to
agree on the proper amount of compensation, and thus, would submit the
valuation of “compensation” to arbitration (the “Arbitration Clause”):
[BC] hereby acknowledges that
a dispute exists between the Parties and [Teal Cedar] intends to submit the
dispute between the Parties as to the amount of the compensation for the Improvements
to which it is entitled for arbitration pursuant to Section 6(6) of the [Revitalization
Act].
(A.R., vol. I, at p. 228)
[16]
As there were no regulations prescribing the
requirements for arbitrators, the parties were free to choose who would preside
over the arbitration. They ultimately selected Thomas Braidwood, Q.C., a former
Justice of the British Columbia Court of Appeal.
III.
Judicial History
[17]
At the initial arbitration, there were two
primary questions of interpretation, which have remained contested up to and
including the appeal before this Court. Those questions of interpretation — one
statutory and one contractual — are the following:
(a) What valuation methods for Improvements Compensation are consistent
with the Revitalization Act? (the “Valuation Issue”)
(b) Does the “compensation” for improvements submitted to arbitration
under the Amended Agreement include interest? (the “Interest Issue”)
[18]
In addition, another question emerged concerning
Teal Cedar’s entitlement to compensation for improvements losses relating to
the Lillooet Licence (the “Lillooet Issue”).
A.
Arbitration Award (Thomas Braidwood, Q.C. —
April 27, 2011, amended June 30, 2011)
[19]
On the Valuation Issue, the arbitrator had to
determine the proper valuation method for Improvements Compensation because no
regulations prescribing such a method had been passed. During a “lengthy and
complex hearing” (as noted by the application judge, at para. 7), he was
presented with three “generally recognized valuation approaches” (para. 112):
(a) the “Market Value Method”, which the arbitrator rejected because the
method is based on determining the market value of the improvements, and BC’s
own expert conceded that no such market value exists in respect of improvements
on Crown land (para. 113);
(b) the “Income Method”, which the arbitrator similarly rejected because
the method is based on determining the income generated by the improvements,
and BC’s own expert conceded that no such income exists in respect of
improvements on Crown land (para. 113); and
(c) the “Depreciation Replacement Cost Method”, which the arbitrator
accepted (paras. 93-94). This method, in simplified terms, valuates
Improvements Compensation by estimating the notional cost of rebuilding the
improvements from scratch (replacement) to their current degraded condition
(depreciation). The arbitrator accepted this method in part because it was the
only valuation methodology presented which determined Improvements Compensation
separately from Rights Compensation, in keeping with their separate treatment
in the Revitalization Act (para. 94; see Revitalization Act, ss.
6(1) to (3) and 6(4)).
[20]
On the Interest Issue, the arbitrator held that
Teal Cedar was entitled to interest on the Improvements Compensation, despite
the No Interest Clause, in light of the factual matrix. Specifically, he found
that, at the time of the Settlement Framework Agreement, when the No Interest
Clause was drafted, the parties were “hopeful” and in the midst of ongoing
negotiations to resolve the Valuation Issue (para. 180). In contrast, at the
time of the Amendment, when the Arbitration Clause was drafted, the parties had
just endured 10 months of failed negotiations, and had come to terms with the
need to resolve the Valuation Issue — including interest — through arbitration
(para. 181).
[21]
Lastly, on the Lillooet Issue, the arbitrator
ruled that Teal Cedar was not entitled to Improvements Compensation for the
Lillooet Licence because it “had not lost any opportunity to use the roads”
(paras. 169-70). Put differently, the arbitrator opined that BC owed no
Improvements Compensation to Teal Cedar for the Lillooet Licence since the
latter never lost access to any improvements associated with that licence.
B.
British Columbia Supreme Court (2012 BCSC 543,
Bauman C.J.)
[22]
The courts reviewing the Arbitration Award had
the additional burden of addressing their jurisdiction to review the award in
the first place (the “Jurisdiction Issue”). Specifically, the arbitration
proceeded under the Arbitration Act, which limits appeals to
questions of law (s. 31). The courts reviewing the Arbitration
Award were consequently confronted with the threshold issue of whether the
Valuation, Interest and Lillooet Issues involved questions of law — the sole
type of question over which the courts have appellate review jurisdiction in
commercial arbitration cases. As additional context, this Court’s decision in Sattva
— where we clarified the general characterization of contract interpretation as
a question of mixed fact and law — was not released until after the first
decision in this case by the British Columbia Court of Appeal. As a result, the
decision of the British Columbia Supreme Court and initial decision of the
British Columbia Court of Appeal were issued without this Court’s guidance in Sattva.
[23]
On the Jurisdiction Issue, the application
judge, Bauman C.J. (now Bauman C.J.B.C.), held that the Valuation Issue
subsumed questions of law and questions of mixed fact and law. Specifically,
the determination of whether the valuation method chosen was consistent with
the Revitalization Act was a matter of “statutory construction” (para.
49 (CanLII)) and thus a question of law within his jurisdiction (para. 57). In
contrast, he found that the application of that method to quantify the value of
the Improvements Compensation involved questions of fact or of mixed fact and
law outside his jurisdiction (para. 57). Similarly, he determined that the
Interest Issue involved interpreting the Amended Agreement “in the context of
the factual matrix” — a question of mixed fact and law outside his jurisdiction
(para. 81). Finally, he held that the Lillooet Issue was a “question of law”
because the arbitrator’s chosen methodology, when applied to the Lillooet
Licence (which contains improvements), should have resulted in Improvements
Compensation for Teal Cedar (para. 84).
[24]
On the Valuation Issue, Bauman C.J. concluded
that the arbitrator’s reliance on the Depreciation Replacement Cost Method was
not only proper but correct (para. 57). He noted that the arbitrator, “in the absence
of any regulatory guidance”, had been forced to interpret the plain words of s.
6(4) (para. 46). Further, he opined that the arbitrator had interpreted s. 6(4)
“in a manner open to him in light of the applicable rules of statutory
interpretation” (para. 50).
[25]
Lastly, on the Lillooet Issue, Bauman C.J.
remitted the issue of Improvements Compensation to the arbitrator because of
“uncertainty” in his reasons (para. 88). Bauman C.J. felt the arbitrator was
“not clear” as to why he denied Improvements Compensation for the Lillooet
Licence (para. 85). He reasoned that, since the Lillooet Licence had associated
improvements and the arbitrator’s methodology assumed that all improvements
would be fully used (para. 86), then Improvements Compensation was apparently
owed in respect of those improvements, just as such compensation was owed in
respect of the improvements associated with the other two licences in dispute.
On that basis, the application judge remitted the value of compensation for
Teal Cedar’s losses in respect of the Lillooet Licence to the arbitrator “for
reconsideration in light of the valuation methodology he has adopted” (para.
88).
C.
Additional Arbitration Award (Thomas Braidwood,
Q.C. — July 3, 2012, amended August 17, 2012)
[26]
In view of Bauman C.J.’s ruling on the Lillooet
Issue, the arbitrator issued an additional award “in an amount equal to the
value of the improvements” relating to the Lillooet Licence (p. 10). He
rendered this decision despite his initial holding that Teal Cedar’s right to Improvements
Compensation was never triggered since it never factually lost its ability to
use those improvements.
D.
British Columbia Court of Appeal Decision #1 (2013 BCCA 326, 364 D.L.R.
(4th) 465)
[27]
The matter came twice before the British
Columbia Court of Appeal. The first time, the Court of Appeal issued two
opinions with diametrically opposed conclusions.
(1)
Majority (MacKenzie
J.A., Lowry J.A. concurring)
[28]
The majority allowed BC’s appeal for the most
part. On the Jurisdiction Issue, MacKenzie J.A. held that the Valuation Issue
(statutory interpretation) and the Interest Issue (contractual interpretation)
were both questions of law and thus fell within the scope of appellate review
of an arbitration award (paras. 57 and 114). In addition, while not explicit in
this respect, the majority appeared to rule that the Lillooet Issue was within
the courts’ reviewing jurisdiction because it related to “whether the
arbitrator used the correct method of valuation in this case”, a question of
law (paras. 55-57).
[29]
On the Valuation Issue, MacKenzie J.A. found
that the arbitrator had erred in law by selecting the Depreciation Replacement
Cost Method (paras. 131-133). Specifically, she noted that this method failed
to recognize Teal Cedar’s actual interest in the improvements (para. 68) by
compensating Teal Cedar as if it owned the improvements, whereas Teal
Cedar had lost only its right to use the improvements — which, in
reality, were owned by the Crown (paras. 68 and 73).
[30]
On the Interest Issue, MacKenzie J.A. held that
the arbitrator had erred in law by letting the factual matrix overwhelm the
words of the contract (paras. 125 and 129). Specifically, she concluded that
the arbitrator had erred by interpreting the Amended Agreement as including
interest in Teal Cedar’s “compensation” submitted to arbitration (para. 136).
On my reading, MacKenzie J.A.’s reasoning on this issue (at paras. 105-30) can
be interpreted in two ways. Either she found that the arbitrator allocated
excessive weight to the factual matrix or that the arbitrator interpreted the
factual matrix isolated from the words of the contract.
[31]
Lastly, on the Lillooet Issue, MacKenzie J.A.
concluded that Bauman C.J. had erred in remitting the issue of compensation for
the Lillooet Licence to the arbitrator. MacKenzie J.A. found that the
arbitrator had correctly denied Teal Cedar compensation for a licence in
respect of which it had suffered no actual loss (paras. 78-79). As a result,
she restored the arbitrator’s original decision to award Teal Cedar no
compensation in respect of the Lillooet Licence (para. 134).
(2)
Dissent (Finch C.J.)
[32]
For his part, Finch C.J., the dissenting judge,
agreed with Bauman C.J. and would have dismissed the appeal in its entirety. On
the Valuation Issue, he held that the arbitrator had not erred in law or
otherwise (paras. 140-43), and thus he would have maintained the arbitrator’s
selection of the Depreciation Replacement Cost Method. On the Interest Issue,
he agreed with Bauman C.J. that the arbitrator’s interpretation of the Amended
Agreement in light of the factual matrix was a question of mixed fact and law
outside the scope of appellate review of an arbitration award (paras. 144-45).
Finally, on the Lillooet Issue, he found that Bauman C.J. had made “no error of
law” in remitting the valuation of compensation for the Lillooet Licence to the
arbitrator (paras. 146-48).
E.
British Columbia Court of Appeal Decision #2
(Remanded Post-Sattva) (2015 BCCA 263, 386 D.L.R. (4th) 40, Lowry, Chiasson and
MacKenzie JJ.A.)
[33]
In 2013, Teal Cedar sought leave to appeal to
the Court from the British Columbia Court of Appeal’s decision. However, in the
intervening period, the Court released Sattva in 2014. Consequently, the
Court remanded the case to the British Columbia Court of Appeal for disposition
in accordance with Sattva (file No. 35563, October 23, 2014, [2014]
S.C.C. Bull. 1637).
[34]
On remand, a unanimous British Columbia Court of
Appeal held that MacKenzie J.A.’s pre-Sattva disposition of the appeal
(concurred in by Lowry J.A.) was unaltered by Sattva (para. 60).
[35]
On the Valuation Issue, the Court of Appeal held
that the standard of review was correctness because the arbitrator lacked
specialized expertise in forestry statutes (para. 35), the parties were
statutorily compelled to resolve their dispute through arbitration (para. 35),
and the Valuation Issue was (1) important to compensation statutes generally
(para. 35) and (2) a question of law attracting a correctness standard (paras.
36-37). Further, the Court of Appeal ruled that the arbitrator’s award was, in
this respect, both incorrect (para. 37) and unreasonable (para. 38) because it
provided a “substantial publicly financed windfall” (para. 38) divorced from
Teal Cedar’s “actual financial loss” (para. 39).
[36]
On the Interest Issue, the Court of Appeal opined
that the arbitrator had made a legal error that gave the courts jurisdiction
(para. 46) because he let the factual matrix overwhelm the contract (para. 52),
despite its clear wording (para. 59). On my reading, the Court of Appeal’s
second decision, like its first, supports two interpretations of what it means
for the factual matrix to “overwhelm” a contract: (1) weighing that matrix
excessively; or (2) considering that matrix in isolation from the words of the
contract.
[37]
The decision of the Court of Appeal on remand
was silent in respect of the Lillooet Issue.
IV.
Issues
[38]
In the end, this appeal involves two key
interpretation issues, one statutory and one contractual, namely whether the
arbitrator erred in law by: (1) interpreting the Depreciation Replacement Cost
Method as being consistent with the Revitalization Act (the Valuation
Issue); and (2) interpreting the Amended Agreement as including interest in
BC’s Improvements Compensation payment to Teal Cedar (the Interest Issue). This
appeal also involves a statutory application issue, namely whether the
arbitrator erred in law by denying Improvements Compensation to Teal Cedar when
he applied his chosen methodology to the Lillooet Licence (the Lillooet Issue).
Whether the courts have jurisdiction to review these issues, and if so, the
applicable standard of review, are also in dispute.
V.
Analysis
[39]
According to the application judge, other than
there being a “question” or “point” of law in dispute (see ss. 31(1)(b) and
31(2)), the requirements for leave under the Arbitration Act were met in
this case on the Valuation Issue (para. 43). Those findings are not challenged
before this Court, though I note that the application judge was silent with
respect to these requirements on the Interest Issue, which he resolved on the
basis of that issue not raising a question of law (para. 81). Similarly, once
the statutory preconditions are met, granting leave to appeal an award under
the Arbitration Act is a matter of judicial discretion: “. . .
the court may grant leave . . .” (Arbitration Act, s.
31(2)). The application judge’s exercise of discretion in this regard is also
not contested before us. As a result, per Sattva (paras. 38, 102 and
107), a three-step analysis for appellate review of the arbitration award below
remains, namely:
(a) Jurisdiction: Whether the appellate court has jurisdiction to review
the alleged error.
(b) Standard of review: If so, whether the standard for the review is
reasonableness or correctness.
(c) Review: Whether the arbitration award withstands scrutiny under that
standard of review (i.e. whether the award is reasonable or correct).
[40]
My analysis will proceed on the basis of this
logical framework.
A.
Jurisdiction
(1)
Jurisdiction to Review Commercial Arbitration
Awards
[41]
The scope of jurisdiction in respect of a
commercial arbitration award, such as the one at issue, is now well-established
in the jurisprudence (Sattva, at para. 104). Here, as in Sattva,
the arbitration was conducted under the Arbitration Act, which limits a
reviewing court’s jurisdiction to questions of law:
31 (1) A party to an
arbitration, other than an arbitration in respect of a family law dispute, may
appeal to the court on any question of law arising out of the award if
(a)
all of the parties to the arbitration consent, or
(b)
the court grants leave to appeal.
(2)
In an application for leave under subsection (1) (b), the court may grant leave
if it determines that
(a) the importance of the result of the arbitration to the parties
justifies the intervention of the court and the determination of the point
of law may prevent a miscarriage of justice,
(b) the point of law is of importance to some class or body
of persons of which the applicant is a member, or
(c) the point of law is of general or public importance.
[42]
Unlike privative clauses which merely “signal”
deference in the context of judicial review of administrative tribunal
decisions, statutory limitations on the scope of appellate review of
arbitration awards are “absolute” (Sattva, at para. 104). In
consequence, a finding that the questions on appeal — the Valuation, Interest
and Lillooet Issues — are not questions of law would wholly dispose of the
issue of the courts’ jurisdiction to review those questions.
[43]
The process for characterizing a question as one
of three principal types — legal, factual, or mixed — is also well-established
in the jurisprudence (Canada (Director of Investigation and Research) v.
Southam Inc., [1997] 1 S.C.R. 748, at para. 35). In particular, it is not
disputed that legal questions are questions “about what the correct legal test
is” (Sattva, at para. 49, quoting Southam, at para. 35); factual
questions are questions “about what actually took place between the parties” (Southam,
at para. 35; Sattva, at para. 58); and mixed questions are questions
about “whether the facts satisfy the legal tests” or, in other words, they
involve “applying a legal standard to a set of facts” (Southam, at para.
35; Sattva, at para. 49, quoting Housen v. Nikolaisen, 2002 SCC
33, [2002] 2 S.C.R. 235).
[44]
That said, while the application of a legal test
to a set of facts is a mixed question, if, in the course of that application,
the underlying legal test may have been altered, then a legal question arises.
For example, if a party alleges that a judge (or arbitrator) while applying a
legal test failed to consider a required element of that test, that party
alleges that the judge (or arbitrator), in effect, deleted that element from
the test and thus altered the legal test. As the Court explained in Southam,
at para. 39:
. . . if a decision-maker
says that the correct test requires him or her to consider A, B, C, and D, but
in fact the decision-maker considers only A, B, and C, then the outcome is as
if he or she had applied a law that required consideration of only A, B, and C.
If the correct test requires him or her to consider D as well, then the
decision-maker has in effect applied the wrong law, and so has made an error of
law.
Such an allegation ultimately
challenges whether the judge (or arbitrator) relied on the correct legal test,
thus raising a question of law (Sattva, at para. 53; Housen, at
paras. 31 and 34-35). Accordingly, such a legal question, if alleged in the
context of a dispute under the Arbitration Act, and assuming the other
jurisdictional requirements of that Act are met, is open to appellate
review. These “extricable questions of law” are better understood as a covert
form of legal question — where a judge’s (or arbitrator’s) legal test is
implicit to their application of the test rather than explicit in their
description of the test — than as a fourth and distinct category of questions.
[45]
Courts should, however, exercise caution in
identifying extricable questions of law because mixed questions, by definition,
involve aspects of law. The motivations for counsel to strategically frame a
mixed question as a legal question — for example, to gain jurisdiction in
appeals from arbitration awards or a favourable standard of review in appeals
from civil litigation judgments — are transparent (Sattva, at para. 54; Southam,
at para. 36). A narrow scope for extricable questions of law is consistent with
finality in commercial arbitration and, more broadly, with deference to factual
findings. Courts must be vigilant in distinguishing between a party alleging
that a legal test may have been altered in the course of its application (an
extricable question of law; Sattva, at para. 53), and a party alleging
that a legal test, which was unaltered, should have, when applied, resulted in
a different outcome (a mixed question).
[46]
From this standpoint, the characterization of a
question on review as a mixed question rather than as a legal question has
vastly different consequences in appeals from arbitration awards and civil
litigation judgments. The identification of a mixed question when appealing an
arbitration award defeats a court’s appellate review jurisdiction (Arbitration
Act, s. 31; Sattva, at para. 104). In contrast, the identification
of a mixed question when appealing a civil litigation judgment merely raises
the standard of review (Housen, at para. 36).
[47]
Given these principles, a question of statutory
interpretation is normally characterized as a legal question. In contrast,
identifying a question, broadly, as one of contractual interpretation does not
necessarily resolve the nature of the question at issue. Contractual
interpretation involves factual, legal, and mixed questions. In consequence,
characterizing the nature of the specific question before the court
requires delicate consideration of the narrow issue actually in dispute. In
general, though, as the Court recently explained in Sattva, contractual
interpretation remains a mixed question, not a legal question, as it involves
applying contractual law (principles of contract law) to contractual
facts (the contract itself and its factual matrix): para. 50.
(2)
Jurisdiction in the Instant Case
[48]
On that basis, jurisdiction in this case can be
readily ascertained. First, I will explain the courts’ partial jurisdiction
over the Valuation Issue. Second, I will explain the courts’ lack of
jurisdiction over the Interest and Lillooet Issues.
(a)
Jurisdiction Over the Valuation Issue
[49]
As held by Bauman C.J. (at para. 57) and Finch
C.J., dissenting (at paras. 140 and 143), the Valuation Issue — i.e. the issue
of selecting a valuation method that complies with the Revitalization Act
— involves a chain of issues, some raising legal questions and others raising
mixed questions. Specifically, two types of questions are engaged by the
Valuation Issue: (1) questions about the broad category of methods that are
acceptable under the terms of the Revitalization Act; and (2) questions
about the specific method, within that broad category of acceptable methods,
that should ultimately be applied.
[50]
The former questions — the methods that are
acceptable under the Revitalization Act — are a matter of statutory
interpretation and, accordingly, are questions of law (Heritage Capital
Corp. v. Equitable Trust Co., 2016 SCC 19, [2016] 1 S.C.R. 306, at para.
23, citing Canadian National Railway Co. v. Canada (Attorney General),
2014 SCC 40, [2014] 2 S.C.R. 135, at para. 33). As a result, the courts have
jurisdiction to review the arbitrator’s resolution of the Valuation Issue in so
far as that resolution involves identifying a pool of methodologies consistent
with the Revitalization Act.
[51]
The latter questions — the preferable method
among those that are consistent with the Revitalization Act — are
inextricably linked to the evidentiary record at the arbitration hearing, where
various experts opined on the virtues of conflicting valuation methodologies.
They are mixed questions, if not pure questions of fact. Therefore, the courts
lack jurisdiction to review the arbitrator’s selection of a specific
methodology among the pool of methodologies which are consistent with the Revitalization
Act.
[52]
The majority of the Court of Appeal in its first
decision appears to have merged the two types of questions above and held that
both were questions of law (para. 57). This is an error because selection among
various technical methodologies which all comply with the compensation
provision is undeniably linked to the complex evidentiary record before the
arbitrator and engages at the very least mixed questions. The decision of the
Court of Appeal on remand does not independently analyze jurisdiction, but it
does describe the interpretation of the compensation provision as a question of
law (para. 37). In so far as that decision recognizes that the courts’
jurisdiction is limited to determining methods that are consistent with the
compensation provision and does not extend to choosing among those methods, it
properly construes the courts’ jurisdiction over the Valuation Issue here.
(b)
Jurisdiction Over the Interest Issue
[53]
In contrast, as Bauman C.J. and Finch C.J.,
dissenting, both found, I conclude that the courts have no jurisdiction to
review the arbitrator’s resolution of the Interest Issue.
[54]
In this case, the arbitrator interpreted the
Amended Agreement — including its No Interest Clause, which originated in the
Settlement Framework Agreement and was unchanged by the Amendment — in light of
the factual matrix. That was the correct legal test (Sattva, at para.
50).
[55]
Still, BC argues that the arbitrator let the
factual matrix overwhelm the words of the contract, which raises an extricable
question of law. In my view, this “overwhelming” principle is subject to two
formulations, neither of which confers appellate review jurisdiction in this
case, albeit for different reasons.
[56]
The first formulation of this “overwhelming”
principle is that the factual matrix overwhelms the words of a contract when it
is weighed excessively. This formulation fails to confer appellate review
jurisdiction here because it is a mixed question.
[57]
The goal of contractual interpretation is
ascertaining “the objective intentions of the parties”, an “inherently
fact-specific” exercise (Sattva, at para. 55). In interpreting the
parties’ intentions, the arbitrator weighed the factual matrix with the words
of the Amended Agreement. He was alive to BC’s submission that the No Interest
Clause, in isolation, precluded interest payments (paras. 178-79). Indeed, the
arbitrator, on a preliminary basis, accepted this submission (para. 179). But
he ultimately held that “[t]he context applying here” revealed a different objective
intent, namely to suspend interest only for the duration of negotiations
(paras. 180-81). Specifically, the arbitrator assessed the evolving
circumstances between the execution of the Settlement Framework Agreement (when
the parties were “hopeful” the dispute would be resolved by negotiation and
inserted the No Interest Clause in respect of compensation owed) and the
execution of the Amended Agreement (when the parties knew negotiations had
failed and submitted the value of “compensation” to arbitration). He held that
the parties, by submitting “compensation” to arbitration, had intended
compensation, interest included, to be within his jurisdiction (para. 181).
[58]
The arbitrator, after a lengthy and complex
hearing, was best situated to weigh the factual matrix in his interpretation of
the Amended Agreement. The fact that he may have placed significant weight on
that evidence in interpreting the agreement does not engage a legal question
conferring jurisdiction on the courts under the Arbitration Act as it
does not alter the underlying test he applied in this case.
[59]
In the Court of Appeal’s first decision, the
majority at times appears to follow the first formulation of the “overwhelming”
principle, and seems to imply that the arbitrator erred in law by placing
excessive emphasis on the factual matrix (para. 125), even though that matrix
had never been manifested in an “express provision” in the contract (para.
127). If this is the approach the majority chose, it improperly conflates
questions of law (needed at the leave stage for jurisdiction) and errors of law
(considered at the merits stage, once jurisdiction has been established). The
identification of an alleged legal error should be based on the arbitrator’s
application of the wrong test, not on the fact that one would have applied the
appropriate legal test differently. Otherwise, it does not raise a legal
question conferring jurisdiction on the courts to review the arbitration award
(Sattva, at paras. 63-66); rather, it skips the jurisdiction stage and
immediately proceeds with a review of the arbitrator’s analysis of a mixed
question.
[60]
Likewise, it is improper to claim that a court
should have jurisdiction to review the arbitrator’s contractual analysis merely
on the basis that it was allegedly incorrect. Indeed, it would even be improper
to claim jurisdiction to review an arbitrator’s analysis merely on the basis
that it was unreasonable. A court looking at the Amended Agreement could have
held that the No Interest Clause precluded interest payments and that the
Arbitration Clause incorporated that preclusion when it submitted
“compensation” (without interest) to arbitration. But to immediately launch
into the merits of the arbitrator’s contractual analysis — whether it is
incorrect or unreasonable — is to put the cart before the horse. His
analysis must first be characterized as raising a legal question. And only on
the basis of that characterization may his analysis then be reviewed.
[61]
Here, the relevant legal principle required the
arbitrator to interpret the Amended Agreement “in light of the factual matrix”
(Sattva, at para. 50). That is precisely what he did. It cannot be found
that the arbitrator changed this legal principle simply because someone else
might have applied it differently in this case.
[62]
The second formulation of the “overwhelming”
principle is that the factual matrix overwhelms the words of a contract when it
is interpreted in isolation from the words of the contract, effectively
creating a new agreement between the parties. This formulation of the
“overwhelming” principle raises a legal question, but it lacks arguable merit
here. As a result, it also fails to confer appellate review jurisdiction in
this case.
[63]
In Sattva, this Court accepted that, in
rare circumstances, the application of an incorrect principle or the failure to
apply a principle could give rise to an extricable question of law (paras. 53
and 62-64; see also Ledcor Construction Ltd. v. Northbridge Indemnity
Insurance Co., 2016 SCC 37, [2016] 2 S.C.R. 23, at para. 21, citing Housen,
at para. 36). As the Court recognized in Sattva, the use of the factual
matrix in contractual interpretation is limited by the legal principle that
contractual interpretation must remain grounded in the text of the contract so
as to avoid effectively creating a new agreement between the parties (para. 57;
see also Hayes Forest Services Ltd. v. Weyerhaeuser Co., 2008 BCCA 31,
289 D.L.R. (4th) 230; Glaswegian Enterprises Inc. v. B.C. Tel Mobility
Cellular Inc. (1997), 101 B.C.A.C. 62; Black Swan Gold Mines Ltd. v.
Goldbelt Resources Ltd. (1996), 78 B.C.A.C. 1973; G. Hall, Canadian
Contractual Interpretation Law (3rd ed. 2016) at p. 33).
[64]
Whether the arbitrator failed to apply the
foregoing principle raises a legal question. That said, merely raising a legal
question does not exhaust the requirements for jurisdiction under s. 31 of the Arbitration
Act. To grant leave on such a question of law, the court must be satisfied
that the ground of appeal has “arguable merit” (Sattva, at para. 74; Arbitration
Act, s. 31(2)(a)). In my view, if the Court of Appeal on remand had
properly conducted a “preliminary examination of the question of law” in light
of the reasonableness standard to be applied (Sattva, at paras. 74-75
and 106), it would have concluded that there is no arguable merit to this
alleged legal error. The arbitrator’s interpretation was rooted in the words of
the contract, not overwhelmed by them. While the arbitrator may have placed
significant weight on the factual matrix when interpreting the meaning of
“compensation”, there is no arguable merit to the claim that he interpreted
that matrix isolated from the contract’s words so as to effectively create a
new agreement (Sattva, at para. 57; Hall, at pp. 33-34).
[65]
Again, contractual interpretation is a
fact-specific exercise. It follows that a question of law premised on the
failure to apply the principle that the factual matrix must not be interpreted
in isolation from the words of the contract will be very difficult to extricate
in practice. On closer examination, it will often amount to nothing more than a
complaint about how much weight was allocated to the factual matrix — in
effect, a disagreement about how the decision-maker interpreted the
words of a contract in light of the factual matrix (Sattva, at paras. 50
and 65). In short, the supposed question of law will often reveal itself to be
a question about whether the decision-maker applied the principle properly — a
mixed question — and not about whether the decision-maker applied the proper
principle. To extricate a question of law based on the alleged error of
having overwhelmed the contract, a reviewing court must be satisfied that the
decision-maker interpreted the factual matrix isolated from the words of the
contract; an approach which could effectively create a new agreement. There is
no arguable merit to the claim that the arbitrator’s analysis here adopted such
a flawed approach.
[66]
Accordingly, on either formulation of the
“overwhelming” principle, the majority of the Court of Appeal (in its first
decision) and the unanimous Court of Appeal (in its second decision) erred in
finding that the courts had jurisdiction to review the Interest Issue.
(c)
Jurisdiction Over the Lillooet Issue
[67]
The courts similarly lack jurisdiction over the
Lillooet Issue because it does not raise a question of law. The majority of the
Court of Appeal did not explicitly discuss jurisdiction over the Lillooet Issue,
but found that the arbitrator had correctly denied Teal Cedar compensation for
the Lillooet Licence. In contrast, the application judge reasoned that he had
jurisdiction over the Lillooet Issue. I disagree with both the application
judge’s finding of jurisdiction and his decision to remit the issue to the
arbitrator for reconsideration.
[68]
Bauman C.J. held that the arbitrator’s
application of his chosen methodology to the Lillooet Licence raised a pure
question of law (para. 84):
Teal argues that as there were
improvements associated with the lost volumes in the Lillooet [Timber Supply
Area], in light of the methodology adopted by the Arbitrator, it is an error on
a pure question of law to deny Teal any compensation for the improvements. I
agree that this raises a question of law . . . .
[69]
In my respectful view, this approach improperly
conflates jurisdiction with review. The alleged presence of an error in
applying the methodology (review) does not necessarily translate into a
question of law (jurisdiction). Rather, the question implicated — whether the
arbitrator correctly applied the valuation methodology to the Lillooet Licence
— is a mixed question. As such, it is beyond the scope of appellate review. A
deeper consideration of the arbitrator’s reasoning reveals how the nature of
the question raised here by the Lillooet Issue is mixed rather than legal.
[70]
In his initial award, the arbitrator denied Teal
Cedar Improvements Compensation for the Lillooet Licence based on its unique
factual attributes. He found that Teal Cedar lost no areas associated with that
licence, and accordingly, suffered no loss of value in respect of improvements
linked to that licence, all of which it was still free to use. In the
arbitrator’s view, this distinguished the Lillooet Licence from the other two
licences, where BC deleted areas, and therefore denied Teal Cedar access to
certain improvements associated with those other licences.
[71]
In effect, the arbitrator reasoned that the
Depreciation Replacement Cost Method, when applied, involves a preliminary
assessment of some loss of access to improvements, in fact, before determining
the value associated with that loss, in law. Consequently, the parties’ dispute
in respect of Improvements Compensation for the Lillooet Licence relates to the
arbitrator’s application of his chosen valuation methodology, a mixed question
beyond the courts’ jurisdiction.
[72]
Indeed, the arbitrator’s basis for denying
Improvements Compensation for the Lillooet Licence — that BC never took any
areas, and thus never took any improvements, relating to that licence — is a
factual inquiry best left to the expertise of the arbitrator whose greater
proximity to the complex facts in this case leaves him best-situated to
adjudicate this matter.
[73]
Having explained why the courts’ jurisdiction is
limited to the Valuation Issue, I will now consider the two remaining steps in
the framework for review of commercial arbitration awards — the standard of
review and the review itself — for that issue alone.
B.
Standard of Review
(1)
Standard of Review for Commercial Arbitration
Awards
[74]
In an arbitral context like this one,
where the decision under review is an award under the Arbitration Act, Sattva
establishes that the standard of review is “almost always” reasonableness
(para. 75). This preference for a reasonableness standard dovetails with the
key policy objectives of commercial arbitration, namely efficiency and
finality. In Sattva, Rothstein J. emphasizes that in “commercial
arbitration, where appeals are restricted to questions of law, the standard of
review will be reasonableness unless the question is one that would attract the
correctness standard” (para. 106). He suggests that this may arise only in rare
circumstances, such as where a constitutional question or a question of law of
central importance to the legal system as a whole and outside the adjudicator’s
expertise is at issue (paras. 75 and 106).
[75]
It follows that the nature of the question under
review — i.e. legal, factual, or mixed — may inform whether one of those
circumstances is present, but it is not dispositive, in itself, of the
applicable standard of review. For instance, it would be an error to claim
that all statutory interpretation by an arbitrator demands correctness review
simply because it engages a legal question. While statutory interpretation is a
legal question (Heritage, at para. 23, citing Canadian National
Railway, at para. 33), the mere presence of a legal question does not, on
its own, preclude the application of a reasonableness review in a commercial
arbitration context. Sattva is clear in this regard.
[76]
In contrast, where the decision under review is,
for example, a civil litigation judgment, the nature of the question is
dispositive of the standard of review, with factual and mixed questions being
reviewed for palpable and overriding error (Housen, at paras. 10 and 36)
and legal questions — including extricable questions of law — being reviewed
for correctness (Housen, at paras. 8 and 36). It is therefore critical
to bear these distinctions in mind when determining the appropriate standard of
review in any given case.
(2)
Standard of Review for
the Valuation Issue
[77]
The decisions below, other than that of the
Court of Appeal on remand, largely avoid the question of the standard of
review. Bauman C.J. held that the arbitrator had “correctly answered” the
Valuation Issue, suggesting a correctness standard of review (para. 57).
Similarly, the majority employed correctness language in their reasoning (para.
57). In dissent, Finch C.J. simply noted the absence of errors in Bauman C.J.’s
Valuation Issue analysis, making the appropriate standard of review immaterial
to his holding (para. 143). To be fair, these decisions predated Sattva
and lacked this Court’s guidance on standard of review in a commercial
arbitration context such as this one.
[78]
However, on remand, the Court of Appeal had the
benefit of Sattva, and its decision was specifically directed toward
reconsidering the majority’s decision in light of Sattva. In my view,
the Court of Appeal erroneously held that the standard of review should be
correctness for the Valuation Issue (paras. 35-37). Its decision appears to
suggest that questions of law, such as statutory interpretation, necessarily
attract a correctness standard of review (paras. 36-37). In so far as the Court
of Appeal intended to make this suggestion, it is incorrect. As stated before,
while the nature of the question (legal, mixed, or fact) is dispositive of the
standard of review in the civil litigation context (Housen, at paras. 8,
10, and 36), it is not in the commercial arbitration context (Sattva, at
paras. 75 and 106).
[79]
Rather, the standard of review on the legal
questions arising from the arbitrator’s analysis of the Valuation Issue is
reasonableness. As discussed, under Sattva, reasonableness review is
almost always applied in commercial arbitration (para. 75). That preference is
not negated here in light of the nature of the question at issue and the
arbitrator’s presumed expertise.
[80]
The question at issue — determining the category
of appropriate valuation methodologies under a BC forestry statute — is not a
previously recognized exceptional question identified in Sattva (paras.
75 and 106). It is clearly not a constitutional question. Similarly, it is
neither of central importance to the legal system as a whole (limited, as it
is, to a single province and a single industry) nor is it outside the expertise
of the arbitrator (whom the parties chose to adjudicate this very dispute and
whose expertise is therefore presumed). Further, the relevant portions of the Dunsmuir
analysis (as per Sattva, at para. 106) favour reasonableness review.
[81]
For example, specialized expertise supports
reasonableness review here. As discussed, the parties selected the arbitrator
to adjudicate this exact issue, hence unambiguously affirming their acceptance
of his sufficient expertise. Despite this, in its decision on remand, the Court
of Appeal held that the arbitrator’s lack of expertise regarding forestry
statutes favoured a correctness standard of review (para. 35). With respect,
that disregards this Court’s guidance in Sattva that arbitrators chosen
by the parties “may be presumed . . . chosen either based on their
expertise in the area which is the subject of dispute or . . .
otherwise qualified in a manner that is acceptable to the parties” (para. 105).
The Court of Appeal’s reasoning also disregards the practical reality that, to
weigh an arbitrator’s actual (as opposed to presumed) expertise in every
arbitration would require some sort of preliminary assessment of the arbitrator’s
level of expertise with a view to establishing the standard of review for every
particular hearing — which would be antithetical to the efficiencies meant to
be gained through the arbitration process.
[82]
Of course, the presumed expertise of a decision-maker
remains a “contextual” consideration (Dunsmuir v. New Brunswick,
2009 SCC 9, [2009] 1 S.C.R. 190, at para. 64). In Sattva,
the arbitration was voluntary (para. 9), whereas arbitration in this case was
statutorily imposed (Revitalization Act, s. 6(6)), a point specifically
made by the Court of Appeal in its decision on remand (para. 35). But that
distinction does not amount to much. The parties in this case still had
complete control over the choice of their arbitrator; despite anticipated regulations
“prescribing requirements for the selection of arbitrators” (Revitalization
Act, s. 13(2)(b)(v)), no such regulations had been enacted at the time the
arbitration arose. In addition, as noted, the arbitrator here considered the
very issue he was mandated to address by both statute and party consent. If an
issue were to arise in the course of an arbitration that was beyond the
foreseeable scope of an arbitrator’s mandate, that could well undermine an
arbitrator’s presumed expertise. But that is simply not the case before us.
[83]
In closing on this point, I observe that the
applicability of a reasonableness standard of review in this case is hardly
disputable. We are, after all, in a commercial arbitration context, in which,
from a policy perspective, the deliberate aim is to maximize efficiency and
finality. Further, the arbitrator was specifically assigned jurisdiction over
the discrete issue of valuation by the Revitalization Act (s. 6(6)), an
issue in which he, having been chosen by consent of the parties, is expected to
have specialized expertise. This merits deferential review.
C.
Review of the
Valuation Issue
[84]
Turning to the review step of the analysis, like
the application judge and the dissent at the Court of Appeal, I find that the
arbitrator’s determination that the Depreciation Replacement Cost Method was
consistent with the Revitalization Act was reasonable. This decision
fell within a range of possible, acceptable outcomes which were defensible in
respect of the facts and law, and the decision was justified, transparent,
intelligible, and defensible (Dunsmuir, at para. 47). In my view, the broad and open-ended language of the Revitalization
Act does not inevitably lead to “a single reasonable interpretation” (McLean
v. British Columbia (Securities Commission), 2013 SCC 67, [2013] 3 S.C.R.
895, at para. 38) such as the market value approach endorsed by my colleagues’
reasons (paras. 133-34).
(1)
Background Observations
[85]
Two background observations reinforce the
reasonableness of the arbitrator’s decision in this case and should be
discussed before the arbitrator’s specific line of reasoning is explored.
[86]
First, the Revitalization Act anticipated
the Lieutenant Governor in Council passing regulations “prescribing methods of
evaluation for use in determining value” (Revitalization Act, s.
13(2)(b)(ii)), but no such regulations had been passed at the time of dispute,
or even at the time of the hearing before this Court (transcript, at p. 9). In
the absence of such regulations, the legislative scheme acknowledges that
determining “value” in these circumstances gives rise to a range of reasonable
interpretations (see Catalyst Paper Corp. v. North Cowichan (District),
2012 SCC 2, [2012] 1 S.C.R. 5, at para. 18, citing Canada (Citizenship and
Immigration) v. Khosa, 2009 SCC 12, [2009] 1 S.C.R. 339, at para. 59). Put
differently, the anticipated (yet non-promulgated) regulations suggest that
determining “value” per the Revitalization Act is not an analysis in
which “the ordinary tools of statutory interpretation lead to a single
reasonable interpretation” (McLean, at para. 38). Indeed, if there were
only one reasonable interpretation for determining value, the regulatory power
provided in s. 13 of the Revitalization Act would be superfluous,
contrary to established principles of statutory interpretation.
[87]
Second, the arbitrator’s determination of a
reasonable valuation method must be assessed in the context of his reasons as a
whole. Three “generally recognized valuation approaches” were presented to the
arbitrator: Market Value, Income, and Depreciation Replacement Cost (para.
112). The arbitrator specifically explained his rejection of the first two
methods on the basis that the value they generated did not correspond to a
sensible value in the context of Crown land (which can neither be sold for
market value nor generate income), a fact admitted by BC’s own expert at the hearing
(para. 113). As a result, the reasonableness of the arbitrator’s analysis
cannot be assessed solely with respect to the reasonableness of the
Depreciation Replacement Cost Method in isolation. As the arbitrator
recognized, all of the methods from the arbitration hearing had their own flaws
(paras. 112-20). This was a reality the arbitrator had to grapple with while
negotiating abundant expert evidence juxtaposing those methods. His ultimate
choice — the Depreciation Replacement Cost Method — was defensible on the facts
and the law.
(2)
Arbitrator’s Award
[88]
With the above background points addressed, I
now turn to the logic of the arbitrator’s award, which proceeded as follows:
(a) The compensation provision entitles Teal Cedar to “compensation
. . . in an amount equal to the value of improvements made to Crown
land.” Accordingly, the arbitrator must select a valuation method for the
“value of improvements made to Crown land”.
(b) The valuation method need not be coterminous with the value of
Teal Cedar’s actual financial loss, as BC argues. Rather, the compensation
provision expressly tells the arbitrator what the valuation method must be
linked to, namely, “the value of improvements made to Crown land”.
(c) The Depreciation Replacement Cost Method was accepted by both parties
as a reasonable means of valuing improvements made to Crown land.
(d) An interpretation of the Revitalization Act as a whole
supports the Depreciation Replacement Cost Method because it is the only
valuation methodology actually presented to the arbitrator that determines
Improvements Compensation separately from Rights Compensation, in keeping with
their separate treatment under the Revitalization Act.
(e) In
any event, interpreting the Revitalization Act is impossible with the
other main methods proposed at the hearing — the Market Value Method and Income
Method — because these methods are inapplicable to Crown land, which cannot be
sold and which cannot generate income.
[89]
This reasoning is supportable and
understandable, and thus reasonable. As found by Bauman C.J. (para. 52) and
Finch C.J., dissenting (paras. 141-43), it is logical to link the quantum of
Improvements Compensation to “the value of improvements made to Crown land”
when that is precisely what is prescribed by the Revitalization Act.
Indeed, linking the quantum of Improvements Compensation to “the value of
improvements made to Crown land” is the stronger plain language interpretation
of the Revitalization Act.
(3)
BC’s Arguments Against the Award
[90]
Conversely, BC’s attacks on the reasonableness
of the arbitrator’s reasoning are, in reality, attacks on the correctness of
the arbitrator’s reasoning. Similarly, the majority — which misidentified the
standard of review as correctness — improperly conducted a correctness review
of the arbitrator’s decision, rather than assessing its reasonableness (para.
68). This tainted their whole analysis of the decision.
[91]
BC’s first argument addresses the plain language
interpretation of the compensation provision. BC’s position is based on a
truncated version of the compensation provision, where BC interprets the word
“compensation” in isolation and reasons that such compensation must be limited
to Teal Cedar’s actual financial loss. This was, similarly, the approach taken
by the majority of the Court of Appeal in its first decision (paras. 68 and
72-73) and subsequently by the Court of Appeal on remand (para. 38). However,
the complete version of the compensation provision sets the value of the
compensation at “an amount equal to the value of improvements made to Crown land”,
as noted by Bauman C.J. (para. 52), and affirmed by Finch C.J., dissenting
(paras. 141-43). If that amount exceeds Teal Cedar’s actual loss, such
reasoning falls far short of indefensible, especially in so far as the
arbitrator’s chosen methodology is: (1) consistent with common law principles
informing the liberal interpretation of remedial expropriation legislation (Toronto
Area Transit Operating Authority v. Dell Holdings Ltd., [1997] 1 S.C.R. 32,
at pp. 44-46, as noted by Bauman C.J. (paras. 46-48)); and (2) the only
methodology of the three presented which reflects the Revitalization Act’s
deliberate separation of Rights Compensation and Improvements Compensation,
also noted by Bauman C.J. (para. 63). Recall that the issue on review is not
whether the arbitrator’s interpretation was correct, but rather whether that
interpretation — which is supported by the plain language of the provision —
was reasonable.
[92]
My colleagues suggest that the “obvious ordinary
meaning” of the compensation provision limits compensation to Teal Cedar’s
“limited interest in the improvements as a licence holder” (para. 112). I
respectfully disagree that this is the only reasonable interpretation of the
provision at issue. Admittedly, the provision mentions that this compensation
is paid to licence holders. But it makes no mention of limiting compensation in
accordance with the nature of a licence holder’s technical legal interest.
Rather, it sets compensation equal to the “value of improvements made to Crown
land”, the interpretation ultimately adopted by the arbitrator.
[93]
BC’s second argument addresses the purpose of
the compensation provision. BC claims that the purpose of the compensation
provision — i.e. paying back companies for the improvements they made and to
which they were subsequently denied access — precludes a “windfall” payment to
companies equal to the notional “value of [all] improvements made to Crown
land”. The majority of the Court of Appeal in its first decision (at para. 73)
and subsequently the Court of Appeal on remand (at para. 38) similarly felt
that “[t]he Legislature could not have intended” such a “publicly financed
windfall” in compensation. Likewise, my colleagues label this “gross
overcompensation” effectively on the basis that it exceeded the market value of
the improvements (para. 134-36). But characterizing the payment resulting from
the Depreciation Replacement Cost Method as a windfall begs the question, i.e.
it assumes that compensation equal to the “value of [all] improvements” is
excessive in the course of explaining that excess. To result in a windfall, the
method would have to provide excessive compensation to forestry companies. And
BC’s basis for claiming that excessive compensation was paid in this case is
the assumption that it was inappropriate for the arbitrator to order
compensation in excess of Teal Cedar’s actual costs, despite the absence of any
reference in the Revitalization Act limiting Teal Cedar’s compensation
to its actual costs or expenses.
[94]
The full “value of improvements made to Crown
land” is the language chosen by the legislature as the quantum for the
compensation provision. If the BC legislature had wanted to pay companies less
than the “value of improvements made to Crown land”, it would not have set the
amount of compensation “equal to” it. As a consequence, the arbitrator’s
reasoning is hardly indefensible, particularly when the wording of the
compensation provision so clearly fixes compensation at the specific amount
chosen by the arbitrator. Further, it is hardly indefensible to select a
valuation method in excess of the actual costs incurred by forestry companies
in improving their Crown land when the commercial value of those improvements —
which are necessary instruments in Teal Cedar’s complex and profitable timber operations
— presumably exceeds the initial costs required to install the improvements in
the first place. Indeed, one could argue that the notional cost of constructing
the improvements attached to certain licences was built in to the cost of
procuring the licence, hence justifying compensation when access to those
improvements was restricted.
[95]
As such, the desire to limit Teal Cedar’s
compensation to its actual loss or damage or to what it lost through BC’s
takebacks is more complex than one might think, further justifying deference to
the arbitrator’s view of the abundant expert evidence before him. For example,
my colleagues hold that the compensation should reflect how Teal Cedar only
lost its right to use the improvements, not the improvements themselves (para.
123). But the arbitrator was clearly alive to this concern when he noted that
the amount of compensation he ultimately determined was lower than Teal Cedar’s
actual historical costs expended on improvements (para. 140), and when he
deducted from his final compensation figure spur roads which, as a matter of
fact, are useless after their initial use (para. 166). Similarly, my colleagues
state that Teal Cedar was already compensated “for future construction costs
through deductions from stumpage fees” (para. 126). But, as the arbitrator
explained with reference to the record before him, stumpage (1) ultimately
affects the value of the harvesting rights, compensation for which the parties
settled on (para. 127); (2) was not even considered in the recognized valuation
methodology he ultimately adopted (para. 127); and (3) cannot negate
Improvements Compensation since the compensation provision presupposes
compensation not captured by other avenues, such as reduced stumpage fees
(para. 156).
[96]
In reality, BC’s “windfall” complaint is not
that Teal Cedar received more compensation than the Revitalization Act requires
in law, but rather, that Teal Cedar received more compensation than it
allegedly deserved in fact. But the arbitrator’s role in interpreting the Revitalization
Act is not to assess the amount of compensation morally owed to Teal Cedar;
it is to assess the amount of compensation prescribed by the Revitalization
Act.
[97]
BC’s third argument is based on discussion of
the Revitalization Act in Hansard, where the former Minister of Forests
described how the compensation provision intended to compensate forestry
companies for the fact that they had actual financial costs associated with
their improvements: “They have built roads; they have built bridges. They deserve
to be compensated for those costs if they are precluded from utilizing that
infrastructure to harvest areas that are going to be redistributed elsewhere”
(British Columbia, Official Report of Debates of the Legislative Assembly
(Hansard), vol. 13, No. 6, 4th Sess., 37th Parl., March 27, 2003, at p.
5682 (Hon. M. de Jong)). But Hansard only goes so far. The words of a statute
carry paramount importance in its interpretation. And the final wording of the
compensation provision specifies that “compensation” will equal the “value of
improvements made to Crown land”. If the legislative intent was to capture
actual costs, the compensation provision could have stated that “compensation”
will be equal to, for example, the “expenses incurred by licensees to improve
Crown land during their licence” or to the “actual costs paid by licensees to
improve Crown land during their licence”. Indeed, assuming that the legislative
intent is actually to compensate companies for the full value of improvements
on the Crown land to which their licences relate, I am hard-pressed to think of
clearer phrasing to convey that intent than the current language of the
compensation provision.
[98]
BC’s final argument addresses the nature of Teal
Cedar’s interest in the Crown land on which the improvements are located. BC
argues that, by paying Teal Cedar for the full value of the improvements, the
arbitrator presumed that Teal Cedar owned the assets and lost them under the Revitalization
Act, whereas Teal Cedar lost only its right to use the assets. This
argument ultimately fails to show the unreasonableness of the arbitrator’s
analysis for the same reason as the other attacks discussed above. Simply put,
Teal Cedar was paid “an amount equal to the value of improvements” because that
is what the compensation provision instructs. When the Revitalization Act
was enacted, BC was no doubt well aware of the nature of forestry companies’
interests in the improvements. Still, BC chose the language of the compensation
provision, making no express link between those interests and the amount of
compensation owed. As Bauman C.J. observed, Teal Cedar’s interest in the
improvements is “wholly irrelevant” because its compensation, and the amount
thereof, is a statutory creation under the compensation provision (para. 52).
In the end, the legislature is entitled to provide forestry companies with
statutory compensation that is not quantified on the basis of the nature of
their interests in the Crown land at issue. Put differently, it is hardly
indefensible to rely on the plain language of the Revitalization Act for
purposes of quantifying compensation, even if extra-statutory references to the
nature of Teal Cedar’s interest may not align with the quantum of compensation
flowing from that plain language.
[99]
In short, BC’s attacks on the arbitrator’s
reasoning are collateral attacks on the correctness of the arbitrator’s
reasonable plain language and contextual interpretation of the compensation
provision. The decisions of the majority of the Court of Appeal and of the
Court of Appeal on remand similarly focused on assessing correctness rather
than reasonableness. My colleagues’ emphasis on Teal Cedar’s “limited interest”
in the improvements is also more akin to “disguised correctness” review (Wilson v. Atomic Energy of Canada Ltd., 2016 SCC 29, [2016] 1 S.C.R. 770, at
para. 27, citing D. Mullan, “Unresolved Issues on Standard of Review in
Canadian Judicial Review of Administrative Action — The Top Fifteen!” (2013),
42 Adv. Q. 1, at pp. 76-81) than the
reasonableness review required. In the end, these approaches fail to show how
the arbitrator’s decision is unjustifiable, non-transparent, unintelligible, or
indefensible. In my assessment, the arbitrator’s decision cannot be overturned
on a reasonableness review.
VI.
Conclusion
[100]
To sum up, I would allow the appeal in part,
with costs throughout to Teal Cedar, who was substantially successful on
appeal.
[101]
As, Bauman C.J. (at para. 57) and Finch C.J.,
dissenting (at paras. 141-43), rightly held, the arbitrator reasonably relied
on the Depreciation Replacement Cost Method of valuation. I would therefore
overturn the Court of Appeal’s holding to the contrary on remand (para. 38) and
restore the arbitrator’s initial valuation, as subsequently amended, predicated
on that methodology.
[102]
Further, Bauman C.J. (at para. 81) and Finch
C.J., dissenting (at paras. 144-45), correctly ruled that the British Columbia
Supreme Court lacked jurisdiction to review the arbitrator’s resolution of the
Interest Issue. Consequently, I would also overturn the Court of Appeal’s
holding to the contrary on remand (para. 58) and restore the arbitrator’s
initial ruling that BC must pay interest on top of the Improvements
Compensation it owes to Teal Cedar.
[103]
However, Bauman C.J. improperly remitted the
Lillooet Issue to the arbitrator for reconsideration (para. 88), since the
British Columbia Supreme Court lacked jurisdiction over this issue.
Accordingly, albeit for different reasons than the Court of Appeal, I would
restore the arbitrator’s initial ruling denying compensation to Teal Cedar for
improvements losses pertaining to the Lillooet Licence.
The reasons of Moldaver, Côté, Brown and
Rowe JJ. were delivered by
Moldaver and Côté JJ. —
I.
Introduction
[104]
This appeal concerns the compensation payable to
a private forestry company, Teal Cedar Products Ltd. (“Teal”), for reductions
made by British Columbia (the “Province”) to three of its forest tenures. Two
questions are at issue in this case: one relates to the contractual
interpretation of an amended settlement agreement made between the Province and
Teal, and the other regards the statutory interpretation of s. 6(4) of the
Forestry Revitalization Act, S.B.C. 2003, c. 17 (“FRA”).
[105]
We agree with our colleague Gascon J. that the
question of contractual interpretation is not reviewable under s. 31 of the Arbitration
Act, R.S.B.C. 1996, c. 55. We would allow the appeal on this issue.
[106]
Where we disagree, however, is with respect to
the question of statutory interpretation. In our view, regardless of the
applicable standard of review, the arbitrator’s interpretation of s. 6(4) of
the FRA cannot stand. As we will explain, the only interpretation of s.
6(4) that withstands scrutiny on either standard of review is that Teal, as a
licence holder, was entitled to receive compensation only for its limited
interest in the improvements. In valuing the improvements under s. 6(4), the
arbitrator was required to take into account that Teal, as a licence holder,
did not own the improvements, which belonged to the Crown. The arbitrator did
not do that. Rather, he selected a valuation method — the cost savings approach
— which failed to consider that Teal had only a limited interest in the
improvements as a licence holder and was therefore not entitled to compensation
on that basis under s. 6(4).
[107]
We would therefore dismiss the appeal in part on
the statutory interpretation issue and remit to the arbitrator the matter of
compensation for the improvements relating to the three licences held by Teal.
II.
Standard of Review
[108]
We find it unnecessary to decide whether the
standard of review applicable to the arbitrator’s interpretation of s. 6(4) of
the FRA is correctness or reasonableness. As we will explain, on either
standard, the arbitrator’s interpretation cannot stand.
III.
Analysis
(1)
Section 6 of the FRA
[109]
The Minister of Forests grants permission to
private forestry companies like Teal to harvest timber on Crown land by issuing
licences under the Forest Act, R.S.B.C. 1996, c. 157. Under these licences,
private forestry companies have rights to harvest timber in certain areas and
use the improvements in those areas. Three such licences are at issue in this
appeal: Tree Farm Licence 46, the Fraser Licence and the Lillooet Licence.
Following the enactment of the FRA, the Province was permitted to reduce
the land base and allowable annual cut of timber under these licences. As a
result of the Province’s takebacks, Teal’s rights to harvest timber and use the
improvements were reduced.
[110]
Section 6 of the FRA provides for
compensation to licence holders for these reductions. Section 6(3) entitles the
licence holder to compensation “in an amount equal to the value . . . of the
harvesting rights taken by means of the reduction”. The licence holder is also
entitled to receive compensation for the “value of the improvements made to
Crown land” under s. 6(4). This provision reads as follows:
(4)
In addition to the compensation to which the holder of an ungrouped licence, a
timber licence or a licence in a group of licences is entitled under subsection
(1), (2) or (3), the holder is entitled to compensation from the government
in an amount equal to the value of improvements made to Crown land that
(a) are, or have been, authorized by the government,
(b)
are not improvements to which section 174 of the Forest Practices Code of
British Columbia Act applies, and
(c)
are not, or have not been, paid for by the government under the Forest Act
or the former Act as defined in the Forest Act.
[111]
The modern principle of statutory interpretation
is well established:
Today there is only one
principle or approach, namely, the words of an Act are to be read in their
entire context and in their grammatical and ordinary sense harmoniously with
the scheme of the Act, the object of the Act, and the intention of Parliament.
(E. A. Driedger, Construction
of Statutes (2nd ed. 1983), at p. 87)
[112]
This principle requires that statutes “be read
to give the words their most obvious ordinary meaning which accords with the
context and purpose of the enactment in which they occur”: CanadianOxy
Chemicals Ltd. v. Canada (Attorney General), [1999]
1 S.C.R. 743, at para. 14; Rizzo
& Rizzo Shoes Ltd. (Re), [1998] 1 S.C.R. 27, at paras. 21-22. The plain
and ordinary meaning of a statutory provision is the “natural meaning which
appears when the provision is simply read through”: Canadian Pacific Air
Lines Ltd. v. Canadian Air Line Pilots Assn., [1993]
3 S.C.R. 724, at p. 735. In our view,
the plain and ordinary meaning of s. 6(4) of the FRA, which accords with
the purpose and context of the Act, is this: the licence holder is entitled to
receive compensation for the improvements on a basis that reflects its limited
interest in the improvements as a licence holder.
(2)
The Plain and Ordinary Meaning of Section 6(4)
of the FRA
[113]
The meaning of “compensation” is understood to
be a payment that makes a person whole for a loss. Compensation is defined by
the Shorter Oxford English Dictionary (6th ed. 2007) as “amends,
recompense; spec. money given to compensate loss or injury” (p. 470).
Under s. 6(4) of the FRA, Teal is entitled to receive compensation equal
to the value of improvements made to Crown land. If the compensation is to
make Teal whole, the value of the improvements must reflect Teal’s actual loss.
[114]
The provision further specifies that Teal, as a
“holder of . . . a licence”, is compensated for the “value of improvements made
to Crown land”. This language makes plain that the improvements do not
belong to Teal. As a licence holder, Teal merely acquires limited rights to use
the improvements. The ownership rights over the improvements remain vested in
the Crown.
[115]
On a plain reading, the provision at issue
entitles Teal to compensation for the value of the improvements to Teal as
a licence holder. If the valuation of the improvements does not take into
account the fact that Teal has a limited interest in the improvements — as
opposed to an ownership interest — then Teal will not receive “compensation”
under s. 6(4); rather, it will receive overcompensation.
(3)
The Purpose and Context of the FRA
[116]
The plain and ordinary meaning of s. 6(4) is
that Teal is entitled to be compensated on a basis that reflects its limited
interest in the improvements as a licence holder. This plain meaning of s. 6(4)
is consistent with the purpose of the FRA and its expropriation context.
The FRA’s purpose is to reduce the rights of licence holders —
specifically, their rights to harvest timber and use the improvements — and to
provide licence holders with compensation for these reductions. As a result of
the takebacks at issue, reductions were made to Teal’s rights to use the
improvements — not ownership rights over such improvements. It runs counter to
the purpose of the FRA to award Teal compensation that exceeds the value
of what it lost due to the takebacks.
[117]
As the arbitrator pointed out, the FRA is
a “species of expropriation legislation” (Arbitration Award, April 27, 2011, at
para. 8). A presumption in favour of a payment of full compensation therefore
applies to its interpretation: British Columbia (Forests) v. Teal Cedar
Products Ltd., 2013 SCC 51, [2013] 3 S.C.R. 301, at para. 37; E. Todd, The
Law of Expropriation and Compensation in Canada (2nd ed. 1992), at p.
35. This presumption, however, does not mean that the owner of an expropriated
property interest is awarded compensation in excess of the value of this
interest. Rather, full compensation makes the owner “economically whole” for
the loss of this interest (Smith v. Alliance Pipeline Ltd., 2011
SCC 7, [2011] 1 S.C.R. 160, at paras. 55-56, citing Diggon-Hibben, Ltd.
v. The King, [1949] S.C.R. 712).
[118]
When the ordinary meaning of s. 6(4) is read
together with the object of the FRA and its expropriation context, we
are satisfied that its meaning is clear and straightforward: an award of
compensation under s. 6(4) must not exceed the value of Teal’s limited interest
in the improvements as a licence holder.
(4)
The Arbitrator’s Valuation Method
(a)
The Cost Savings Approach
[119]
The arbitrator applied a valuation methodology
that he referred to as the “cost savings approach” to assess the compensation
owed to Teal under s. 6(4). This approach, which was developed as a
valuation method for “private timberlands”, values compensation for Teal as if
Teal was a private owner of the improvements. As such, it fails to take into
account the fact that Teal did not own the improvements but had only a limited
interest in them as a licence holder.
[120]
The cost savings method is based on the
depreciated replacement cost of the improvements (Arbitration Award, at para.
75), which is the cost of replacing “the entire useful road and improvement
network for the take back areas”, namely, “all roads and associated
improvements that would access harvestable timber within the taking areas” in
their current depreciated condition (para. 81). According to the cost savings
methodology, Teal is entitled to compensation for this depreciated replacement
cost (para. 75). This is because before the reductions, there was an existing
network of improvements and Teal did not have to pay to construct improvements
to access timber for harvesting (para. 93). After the Province’s reductions to
Teal’s land base, Teal would have to expend money to replace the improvements
and therefore should be compensated for this cost (para. 93).
(b)
The Arbitrator Applied the Cost Savings Approach
in Valuing the Improvements in the Lillooet Licence
[121]
As noted by our colleague Gascon J., the
arbitrator also applied the cost savings method to value the improvements
associated with the Lillooet Licence. The arbitrator awarded no compensation
for these improvements, which is in fact consistent with the cost savings
approach (para. 170).
[122]
Unlike the other two licences, the Province did
not take back any operating areas from the Lillooet Licence (Arbitration Award,
at para. 168). The reduction made to the Lillooet Licence by the Province was
limited to reducing the allowable harvest cut by 54.3% (para. 168). Therefore,
as the arbitrator found, Teal did not lose any opportunity to use the roads
(para. 169) and accordingly did not need to expend money to replace the
improvements. As a consequence, under the cost savings approach, Teal was not
entitled to receive the depreciated replacement cost of the improvements
associated with the Lillooet Licence.
(5)
The Cost Savings Approach Adopted by the
Arbitrator Fails to Account for the Fact That the Improvements Are Not Owned by
Teal
[123]
In applying the cost savings valuation method to
value the improvements associated with all three licences held by Teal, the
arbitrator failed to consider that Teal, as a licence holder, had only a
limited interest in the improvements. The cost savings approach may be an
appropriate methodology in the context of privately owned land. But the roads
and bridges at issue in this case belonged to the Crown. Given that Teal did
not own the improvements and had only a limited interest in the improvements as
a licence holder, it cannot be said that it lost the replacement cost of the
improvements when the Province made reductions to the land base under its
licences. As stated by the majority of the Court of Appeal in its first
decision, “Teal had the right to use the improvements. It therefore lost only
the use of the assets, not the assets themselves”: 2013 BCCA 326, 46
B.C.L.R. (5th) 272, at para. 73 (emphasis added).
[124]
The arbitrator reasoned that the cost savings
approach was applicable to the improvements because it accurately determined
the “value to the owner”, which is one method of assessing “full compensation”:
Todd, at pp. 110-11. The “value to the owner” approach assesses compensation on
the basis of what a prudent owner would pay for its property interest rather
than be divested of it (MacMillan Bloedel Ltd. v. British Columbia
(1995), 12 B.C.L.R. (3d) 134 (C.A.), at paras. 29-32). The application judge,
who agreed that the “value to the owner” approach applied by the arbitrator was
consistent with “full compensation” likewise found that Teal was entitled to
what a prudent owner “would have been willing to give for the improvements
rather than be dispossessed of those improvements”: 2012 BCSC 543, at para. 67
(CanLII).
[125]
We do not agree that the “value to the owner”
approach may serve as a basis for entitling Teal to the depreciated replacement
cost of the improvements under s. 6(4) of the FRA. The “value to the
owner” method awards compensation on the basis of the value to Teal of its interest
in the improvements. Given that Teal did not own the improvements and had only
a limited interest in them, Teal would not pay the full cost to replace the
network of improvements at issue.
[126]
It is also significant that as a licence holder
with only limited rights to the improvements, Teal would be compensated by the
government for future construction costs through deductions from stumpage fees.
As noted by the majority of the Court of Appeal in its first decision, if Teal
chose to rebuild the improvements taken under the FRA, it would receive
compensation for its construction costs through those deductions
(para. 74). In assessing what Teal would pay to avoid being divested of
its interest in the improvements under the “value to the owner” method, the
fact that Teal is reimbursed for future construction costs through deductions
from stumpage fees is a relevant consideration. This reimbursement would
logically affect the amount Teal was willing to pay to avoid being dispossessed
of its interest in the improvements. Furthermore, Teal’s rights to use the
improvements were conditional on Teal paying to maintain the roads under permit
and deactivating them when they were no longer in use (s. 79(2) of the Forest
Planning and Practices Regulation, B.C. Reg. 14/2004). Given that Teal had
only this limited interest in the improvements, it would not pay for the full
cost of replacing the improvements at issue to avoid being divested of them.
(6)
The Market Value Approach
(a)
The Arbitrator Erred in Narrowly Construing the
Scope of Section 6(4) of the FRA to Exclude the Market Value Approach
[127]
In our view, it was not open to the arbitrator
to adopt the cost savings approach under s. 6(4) of the FRA. In our
view, there was, however, an option before the arbitrator that is consistent
with this provision.
[128]
As our colleague Gascon J. notes, there were
three valuation methodologies put before the arbitrator: (1) market value; (2)
income and; (3) depreciated replacement cost, which includes the cost savings
approach. The arbitrator rejected the first two methodologies on the basis that
they could not serve to value the improvements independently from the
harvesting rights. He noted that the FRA draws a distinction between the
value of harvesting rights and the value of improvements. In his view,
[t]o give this distinction meaning, the
value of the improvements must be determined independent of the considerations
that would be at issue in the context of determining either the value (market
or value to owner) of the tenure as a whole, or the harvesting rights as an
independent matter. [para. 110]
[129]
The arbitrator interpreted s. 6(4) of the FRA
to mean that the value of the improvements had to be calculated separately and
independently from the harvesting rights, without reference to the value of the
licence or tenure as a whole. The arbitrator found that the market value
approach could not value the improvements in this manner. Since there is no
market for the sale of improvements, the market value of the improvements must
be determined by first considering the market value of the licence or tenure as
a whole. The arbitrator accepted that the cost savings approach was the only
valuation methodology that could value the improvements separate and apart from
the tenure as a whole (para. 94).
[130]
In our view, the arbitrator construed s. 6(4) of
the FRA too narrowly in concluding that the distinction drawn by this
provision between the value of the improvements and the value of the harvesting
rights means that the market value of the tenure as a whole cannot be considered
when determining the value of the improvements. With respect, there is nothing
in the language or context of the Act to support this unduly restrictive
reading of s. 6(4). On the contrary, it was open to the arbitrator to select any
valuation method that could evaluate the value of the improvements to Teal as a
licence holder, as long as the approach valued the improvements as separate and
distinct from the harvesting rights.
(b)
The Market Value Approach Is Consistent With
Section 6(4) of the FRA
[131]
Although the market value approach does consider
the value of the licence or the tenure as a whole, it can ultimately serve to
value the improvements separately and independently from the harvesting rights.
The Province’s expert witness, Eleanor Joy, explained this methodology as
follows:
. . . it is important to understand
that what I was doing was a market value approach. So I looked historically at
what people were willing to pay for timber tenures, and then I looked at
whatever evidence I could find that would give me some indication of what
people believed the roads were as a percentage of that overall amount they were
willing to pay for timber tenures.
[132]
As the arbitrator observed, Ms. Joy drew on
market data of sales of licences “to derive an approximate cost per cubic meter
for tenures” and then allocated “a percentage of that value to the improvements
at issue here” (para. 121). To determine what percentage of the value of the
tenure as a whole should be allocated to the improvements, Ms. Joy consulted
financial statements of forestry companies which apportioned certain values to
the improvements, as well as press releases issued by forestry companies regarding
settlements reached with respect to their compensation claims under the FRA
(Arbitration Award, at para. 122). Ms. Joy therefore calculated the value of
improvements on the basis of what forestry companies were willing to pay for
tenures and the percentage of that value the companies allocated to the
improvements.
[133]
The market value approach therefore not only
values the improvements separately and independently from the harvesting
rights; it also ensures that Teal in this case does not receive more compensation
than the value of its interest in the improvements. Forestry companies such as
Teal that purchase timber licences do not value improvements as if they were
acquiring exclusive ownership of them. Rather, what they are willing to pay for
the improvements is based on their projected use of the improvements, as well
as on other related considerations, such as the government’s reimbursement of
construction costs for licence holders. Accordingly, the improvements are worth
a fraction of the total value of the licence or tenure. As Ms. Joy
explains,
A. . . . I
think my argument would be, if somebody was willing to give up their timber
tenures for $5.1 million, the roads have to be a fraction of that amount.
Q. Why do they have to be a
fraction of that amount?
A. Well, for all sorts of
different reasons that we’ve already covered. When they’re going to be used,
whether stumpage reimburses, so if people are indifferent between building or
using existing roads, the quality of the roads, the type of roads. All of those
factors feed into it.
[134]
In summary, the market value approach put
forward by Ms. Joy takes into account that Teal has a limited interest in the
improvements. This valuation method was available to the arbitrator under s.
6(4) of the FRA, and yet the arbitrator chose to apply a method that was
inconsistent with this provision. This resulted in a substantial windfall for
Teal: Ms. Joy estimated that the value of the improvements under the market
value approach was about $1.5 million, whereas the arbitrator estimated that
the value was $9.5 million when applying the cost savings approach (Arbitration
Award, at para. 194).
[135]
To be clear, it was open to the arbitrator to
select any valuation method that was consistent with the only reasonable interpretation
of s. 6(4) of the FRA: namely, that compensation must be awarded to Teal
on the basis of its limited interest in the improvements. Contrary to the
assertion of our colleague, we are of the view that the market value approach
is merely one method that the arbitrator could have applied under s. 6(4) of
the FRA.
(7)
Conclusion
[136]
In the end, the complexity of the valuation
evidence seems to have had the unfortunate effect of masking the forest for the
trees. The only interpretation of s. 6(4) of the FRA that withstands
scrutiny on either standard of review is that Teal is entitled to compensation
for its interest as a licence holder in the improvements. If the compensation
awarded to Teal under s. 6(4) does not reflect its limited interest in the
improvements, Teal does not receive compensation; rather, it receives gross
overcompensation — and at the taxpayer’s expense. As the Court of Appeal stated
on remand, “[i]t cannot be . . . that a statute that provides for compensation
be interpreted to mean it provides for a substantial publicly financed
windfall, which would serve no purpose”: 2015 BCCA 263, 386 D.L.R. (4th) 40, at
para. 38. Indeed, the arbitrator’s interpretation leads to the absurd result of
having the British Columbia public compensate Teal for a private ownership
right to the improvements — even though no such right or interest exists and
the improvements at issue are owned by the Crown.
[137]
As we have explained, there was a valuation
method before the arbitrator that was consistent with s. 6(4) of the FRA,
yet the arbitrator rejected it based on an interpretation of the provision that
does not withstand scrutiny on either standard of review. With respect, we see
no defensible basis for this interpretation.
IV.
Disposition
[138]
We agree with our colleague Gascon J. that the
appeal should be allowed on the contractual interpretation question.
[139]
For the reasons stated, we would dismiss the
appeal in part on the statutory interpretation issue. We would not, however,
restore the arbitrator’s decision to award no compensation for the improvements
associated with the Lillooet Licence. Although the majority of the Court of
Appeal agreed with the arbitrator’s valuation of the improvements associated
with the Lillooet Licence, we have found that the arbitrator applied an
improper interpretation of s. 6(4) of the FRA when valuing these
improvements. Accordingly, we would remit to the arbitrator the matter of
compensation for the improvements relating to all three licences at issue,
namely Tree Farm Licence 46, the Fraser Licence and the Lillooet Licence.
Appeal
allowed in part with costs throughout, Moldaver,
Côté, Brown and Rowe JJ. dissenting in part.
Solicitors for the
appellant: Hunter Litigation Chambers, Vancouver.
Solicitor for the
respondent: Attorney General of British Columbia, Vancouver.