Supreme Court of Canada
Southern Canada Power Co. Ltd. v. The King, [1936]
S.C.R. 4
Date: 1936-01-15
The Southern Canada
Power Company Ltd. (Defendant) Appellant;
and
His Majesty The
King (Plaintiff) Respondent.
1935: April 24, 25, 26, 29, 30, 1936: January
15.
Present: Lamont, Cannon, Crocket and Davis
JJ. and Dysart J. ad hoc.
ON APPEAL FROM THE EXCHEQUER COURT OF CANADA
Crown—Canadian National Railways—Railway
embankment—Washed out by overflow of water and ice during spring—Construction
of dam upstream—Interference of natural course of river—Derailment of
train—Damages—Servitude—Riparian owner—Liability of owner of dam—Ruling as to
various species of damages caused to the railway company—Water-Course Act,
R.S.Q., 1925, c. 46, s. 12—Arts. 499, 500, 501, 503, 508 C.C.
The Crown, as owner of the Canadian National
Railways Company, brought an action against the appellant company for the
recovery
[Page 5]
of a sum of $81,523.20 for damages caused
through the derailment of a train in consequence of a sudden washout of the
railway embankment between the viaduct over the highway and the railway bridge
crossing the St. Francis river, near Drummondville,
P.Q. The Crown alleged that the loss and damage were
the consequence of the construction, in 1928, of a large power house and dam,
across the river about two and a half miles upstream from the embankment, which
were owned, maintained and operated by the appellant company. The Exchequer
Court of Canada maintained the respondent’s action for the full amount claimed,
less a sum of $600.
Held that the
appellant company was liable, as the existence of the appellant’s dam led
directly to the washing out of the railway embankment, but that the amount of
the damages awarded by the trial judge should be reduced to $31,418.03.
Held, per
Cannon and Crocket JJ. and Dysart J. ad hoc, that, under the laws of
Quebec, the appellant company could be held liable only for the damages caused
by the injury to the enjoyment of the rights of the railway company as riparian
owner; and thus it would not include the locomotive and rolling stock which
happened to reach the site of the embankment after the washout. The statutory
liability cannot be extended beyond what the law has fixed as the price of the
servitude on riparian owners, i.e., the damage caused to the riparian owner, as
such, of any property by the damming of the waters. Under the circumstances the
failure of the railway employees to safeguard the train was a failure in an
obvious duty and relieves the appellant from responsibility for all damages
resulting directly or indirectly from the destruction of the dam. Consequently,
the respondent was entitled to recover only the costs of repairs to tracks,
$5,254.57, the costs of repairs to structure, $13,004.47, and the costs of
diversion of train service and of special train service, $13,158.99, making a
total sum of $31,418.03.
Per Lamont and
Davis JJ.—In addition to the above-mentioned damages, a further sum of
$30,235.78 should be awarded to the respondent for costs of repairs to the locomotive
and the cars. The liability for damages resulting from the construction and
maintenance of the works of the appellant was not confined to such damages as
might reasonably have been anticipated by the appellant; when it is found that
a man ought to have foreseen in a general way consequences of a certain kind it
will not affect him to say that he could not foresee the precise course or the
full extent of the consequence which in fact happened. If liability is once
established by proof of the relation of cause and effect, then those damages
that flow directly are recoverable. The appellant had lawful governmental
authority to construct and maintain its works in and across the St. Francis
river, but it took that authority subject to the obligation created by section
12 of the Water-Course Act, R.S.Q. 1925, c. 46, of becoming “liable for
all damages resulting therefrom to any person, whether by excessive elevation
of the flood-gates or otherwise.” While the appellant was put by the statute
into the position of being able lawfully to construct, maintain and operate its
works, it was under the condition subsequent that it should, notwithstanding
that there was no injuria, pay, under a liability imposed by the statute, for
the damnum which should from time to time prove to have been
[Page 6]
occasioned to any person therefrom; and the
language of the statute embraces damages, whether they occur above or below the
obstruction in the river, that result from any of such works.
Held that the
respondent was not entitled to recover the sum of $19,592.35 for medical and
hospital services to employees and passengers who were victims of the accident,
for funeral and ambulance expenses, for indemnities to passengers and employees
and for wages paid to disabled employees.
Judgment of the Exchequer Court of Canada
([1934] Ex.C.R. 142) varied.
APPEAL from the judgment of the Exchequer
Court of Canada,
maintaining the respondent’s action.
The material facts of the case and the
questions at issue are stated in the above head-note and in the judgments now
reported.
J. L. Ralston K.C., Alphonse Décary K.C.
and Joseph Marier K.C. for the appellant.
L. E. Beaulieu K.C. and J. P. Pratt K.C.
for the respondent.
The judgment of Lamont and Davis JJ. was
delivered by
Davis J.—On Easter Sunday, April 8, 1928, at about four o’clock in the
afternoon, a passenger train of the Canadian National Railways bound for the
city of Montreal from the city of Quebec was derailed near the town of
Drummondville in the province of Quebec in consequence of the sudden washout of
the railway embankment on the east side of the St. Francis river. The
locomotive and the baggage car were thrown into the bed of the river and the
second-class passenger coach fell upon the baggage car though its rear truck
remained on the rails. The railway embankment was a little over 90 feet in
length and about 20 feet in height. Railway men speak of this embankment as
part of the bridge, but it was in fact a gravel embankment in use to carry the
railway tracks to the level of the bridge proper that crossed the river. This
embankment was suddenly washed out shortly before the arrival of the train at
that point by a tremendous overflow of water and ice which had come down the St. Francis river. The tracks that had lain
upon the embankment were left hanging over the gap caused by the washout of the
embankment and the trainmen being unaware of this condition until a moment or
so
[Page 7]
before reaching the place of the embankment, the
calamity occurred. A woman residing in the vicinity who had been watching the
movement of the water and ice in the river heard the whistle of the locomotive
and realizing the danger ran along the tracks towards the approaching train and
signalled the engineer to stop. The engineer immediately applied the emergency
brakes and reduced the speed of his train as best he could but the distance was
too short within which to bring his train to a stop and the locomotive and cars
plunged into the bed of the river. The engineer was so seriously burnt in the
cab of his engine that he died within the week as a direct result of the
accident; two men in the baggage car were drowned; several passengers were more
or less seriously injured; and the cars and the trackage were badly damaged.
The construction of the embankment dated back to
1887. It had been built in that year by the Drummond County Railway Company and
when in 1899 the Government of Canada bought the railway and undertaking of the
Drummond County Railway Company, the embankment became and remained the property
of His Majesty and had been in continuous use since 1887 in connection with the
railway line across the St. Francis river bridge. The embankment had been
inspected regularly by the railway men and had been kept in what appears to
have been a reasonably good state of repair. The railway at this point is part
of what is known as the Canadian National Railway System owned by the Dominion
Government and the loss and damage were attributed by those in charge of the
operation of the railway to the existence of a large power house and dam
constructed in 1925 across the St. Francis river about two and a half miles
upstream from the embankment and owned, maintained and operated by the
appellant, The Southern Canada Power Company, Limited.
His Majesty on information of the
Attorney-General of Canada commenced proceedings in the Exchequer Court of
Canada against the appellant to recover the loss and damages sustained by the
railway. The total claim amounted to $81,523.20. His Majesty recovered judgment
in the Exchequer Court of Canada for the full of the amount of the claims less
only the sum of $600 being the amount of a gratuity made to the woman who had
signalled the train to
[Page 8]
stop. The different items of damage in the claim
may be conveniently divided for consideration into three general classes.
Firstly, there is the damage involved in the destruction of the embankment and
the damage to the tracks amounting in all to $18,259.04. Secondly, the cost of
repairs to the locomotive and the cars and the cost of auxiliary and wrecking
train service, and of the diversion of the train service. These items total
$43,671.81. Thirdly, there is a class of items made up of disbursements for
medical and hospital services, funeral and ambulance expenses, indemnities to
passengers and employees, wages paid to the disabled conductor of the train and
the $600 gratuity above referred to. These items in this class total
$19,592.35. The appellant appeals to this Court from the judgment rendered
against it in the Exchequer Court of Canada.
The quantum of damages in respect of each of the
items in the claim is admitted but liability is denied in respect of the entire
claim.
A preliminary objection was raised by the
appellant at the trial and renewed before us that the Crown had no right to
take these proceedings in the Exchequer Court of Canada, the contention being
that the right of action was by statute vested in the Canadian National
Railways Company and that that company could only sue in the ordinary courts
and not in the Exchequer Court of Canada. The learned trial judge carefully
reviewed the statutory law upon the subject and concluded, I think rightly,
that the Crown was the owner of the railway and had never given up its right to
sue for any claim it had in connection with the operation of the railway. The
particular section of the railway in which the accident occurred has an
interesting history as part of the old Intercolonial Railway, it having become
the duty of the Government of Canada by virtue of sec. 145 of the British North
America Act to provide for the commencement within six months after the
Union of a railway connecting the river St. Lawrence with the city of Halifax
in Nova Scotia, and for the construction of such railway without intermission
and its completion with all practicable speed. It was in the fulfillment of
that duty imposed upon the Government of Canada by the Act of Confederation
that the undertaking of the Drumond County Railway Company was acquired in
1899, and thereafter
[Page 9]
formed part of the Intercolonial Railway. It
became and has continued to be the property of His Majesty in right of the
Dominion of Canada. The ownership has never been conveyed to the Canadian
National Railways Company, but to that company the management and operation of
the railway have been entrusted by statute. While a right of action was given
to the railway company by sec. 33 of the Canadian National Railway Act, R.S.C.
1927, ch. 172, and this action might have been taken in the name of the
Canadian National Railways Company, His Majesty in right of the Dominion of
Canada did not relinquish his right as owner to sue. That being so, there is no
ground for the further objection that the action should not have been brought
in the Exchequer Court of Canada. The learned trial judge has carefully and
correctly reviewed and stated the pertinent statutory provisions and the
authorities, and it is unnecessary to repeat them.
The real question is that of liability, and
apart from considering the items in the three classes of claims in the light of
the law applicable to each of these classifications taken separately, the
general question of liability is very largely one of fact. The learned trial
judge has very carefully reviewed the evidence in great detail and at
considerable length and counsel before us readily conceded that the recital of
facts was substantially accurate in all respects. It is unnecessary therefore
to repeat them here except in so far as may be necessary to indicate in a
general way the problem that confronts us in the consideration of this appeal.
Nothing further need be said for the moment as
to the construction and state of repair of the railway embankment but some
general remarks at the outset as to the construction and maintenance of the dam
and power house of the appellant may be appropriate. There were in fact two
dams of the appellant. One, with which we are only incidentally concerned, was
situate about 1,100 feet upstream from the railway bridge. Its history goes
back to 1896, when the town of Drummondville built a wooden dam at
substantially the same point. In 1918 the appellant acquired the power plant of
the town of Drummondville, including this old wooden dam, and erected a new dam
a few inches higher than the old one and at a location approximately 50 feet
[Page 10]
below the old dam which was demolished. This dam
of course constituted an obstruction in the river and no doubt had some effect
upon the ordinary flow of the river in its natural state but standing alone
would not, I think, have been charged with the cause of the accident. In 1925
the appellant built a large power plant and dam across the St. Francis river
about two and a half miles upstream from the railway bridge at what was known
as Hemmings falls. The appellant is a company incorporated under the Dominion Companies
Act in 1913 with its chief place of business in the province of Quebec.
Carrying on its operations in that province it became subject to the laws of
that province and particularly to the Water-Course Act, R.S.Q. 1925, ch.
46, to which I shall later refer. The St. Francis river being a navigable river, it was necessary under federal legislation
that the plans of the works to be undertaken in the river by the appellant
should be submitted to and approved by the Minister of Public Works of Canada.
While there is neither proof nor admission that such approval was obtained, it
has been assumed throughout that there was such authority and no point has been
made of any lack of governmental authority in connection with the construction
and maintenance of the power house and the dams. The question of liability for
damages that might result from the construction or maintenance of the works
need not be discussed until we have a clear understanding of the facts. It is
sufficient for the moment to state that under sec. 12 of the Water-Course
Act,
the owner or lessee of any such work shall
be liable for all damages resulting therefrom to any person, whether by
excessive elevation of the flood-gates or otherwise.
The real question, apart from any consideration
of the statute, is a question of fact as to whether or not the damages claimed
in the action resulted from the presence in the river of the works of the
appellant.
Reverting then to the large dam at Hemmings
falls, the construction of that dam raised the level of the water upstream 9·2
feet and created a basin about five and a half miles in length where previously
there had been one not exceeding three and a half miles. The natural width of
the river within the five and a half miles of basin was inevitably widened and
at some point very considerably. At one point the width became almost doubled
and reached a distance of
[Page 11]
over half a mile. The dam itself was some
fifty-four feet in height of solid concrete wall. This dam with the large power
house stretches across the entire width of the river. There are, of course,
sluice-gates and a spillway and on top of the spillway are placed removable
flash boards seven feet high to further raise the level of the water when
necessary. Farther upstream from Hemmings falls, a distance of about five and a
half miles, was what was known as the Dauphinais rapids. The water level from the foot of the Dauphinais rapids
downstream for a distance of about three and a half miles, before the
construction by the appellant of the dam at Hemmings falls, gradually fell
about one foot. Then from that point to a point approximately five hundred feet
below the point where the dam now stands there was a drop in the level of
nearly forty-five feet which was what was called the Hemmings falls. As a
consequence of the erection of the dam the Hemmings falls rapids were entirely
wiped out and about two-thirds of the Dauphinais rapids were wiped out, and the
level of the river between the head of Hemmings falls rapids and the foot of
the Dauphinais rapids was raised 9·2 feet.
The basis of the claim against the appellant is
that the tremendous rush of water and ice that so suddenly washed out the
railway embankment on the day in question was the direct result of the
interference of the appellant with the natural condition of the St. Francis
river by the obstructions caused by the erection and maintenance by the
appellant of its two dams, the one built in 1918 about 1,100 feet upstream from
the railway bridge, and, principally, the other dam, constructed in 1925 at
Hemmings falls. Did the damage result from these works of the appellant? That
is the real problem in this case. And it is almost entirely, if not entirely, a
question of fact. The substantial defences to the action were: (1) That the
events which took place on the occasion of the ice break of 1928 were brought
about by causes of nature that were entirely abnormal and to which the
existence of the dam had no reference. Great formations of ice, unusually heavy
rainfall, sudden rise of temperature, were said to have united in creating such
a combination of abnormal natural conditions as to cause the accident without
reference to the existence of the dams. (2) That if the dam had in fact any
influence upon the
[Page 12]
situation, it acted as a regulator and moderator
controlling to some extent the spring floods and distributing their effect so
as to reduce what would otherwise have been a worse condition. (3) That the
railway had itself been negligent in continuing to use the old gravel
embankment, having regard to the history of the conditions on the river which
had occurred periodically during some years past, and which called for
precautionary measures on the part of the railway company in the construction
of a substantial structure to carry the tracks between the viaduct over an
adjacent highway and the bridge in question. (4) That having regard to the
known condition of the river during two or three days before the accident, the
railway company should have taken heed of the probability of the embankment
being washed out and have watched the place of the embankment to guard against
any train passing over until satisfied that it was safe to do so. I purposely
refrain for the moment from discussing other questions of defence that go to
liability, if any, in respect of the different classes of claims treated
separately. The basic problem is the general question whether or not the
washout of the railway embankment resulted directly from the existence of the
works of the appellant in the river. And that is a question of fact.
The learned trial judge put his conclusion in
these words:
After weighing carefully all the evidence,
oral and literal, I can reach no other conclusion than that the dam of the
defendant company at Hemmings falls was responsible for the washout of the
railway embankment at Drummondville on Sunday, April 8, 1928.
The trial of the action took fourteen days.
There are 959 pages of evidence besides 133 exhibits, including maps, plans,
profiles, charts, photographs, records, water levels, records of flow,
meteorological reports, vouchers, etc. More than one hundred witnesses gave
evidence at the trial and over sixty per centum of the oral testimony was given
in French. The learned trial judge, with his mastery of both the English and
the French languages, was specially qualified to fully appreciate the oral
testimony and has with great care minutely reviewed all the evidence in a
judgment extending to fifty-eight pages. He heard and saw the expert witnesses
and all the lay witnesses, the latter being mostly residents in the vicinity
who described what they saw and told what they knew not only of the immediate
events of the accident but of the happenings upon the
[Page 13]
river over the past many years. On a question of
fact as to whether the damage to the railway embankment was caused by the
existence of the works of the appellant, the trial judge was in a particularly
advantageous position to properly weigh the mass of contradictory testimony and
it would need something very clear and definite in the evidence to satisfy any
court of appeal that findings of fact of a trial judge in such a case should be
reversed. Counsel for the appellant very ably presented to us their analysis of
the evidence in support of their contention that the trial judge had upon the
evidence reached a wrong conclusion. During a lengthy argument they raised in
our minds at times certain doubts but the very nature of the problem is such
that one cannot look for certainty and must be content upon the balance of
probabilities as to whether or not there was any direct relation between the
existence of the dam and the damage to the embankment. A careful study of the
evidence in the light of the arguments presented to us by counsel for the
appellant has failed to satisfy me that the trial judge was wrong in the
conclusion that he reached on the general question of liability.
No useful purpose is to be served by reviewing
again the evidence in the case. The main defence of the appellant was that the
accident was simply the result of a combination of natural forces and should be
attributed to the act of God. In the carefully prepared factum presented to
this Court by counsel for the appellant it is stated that they believe they are
in a position to successfully demonstrate
that the evidence, although contradictory on many points, confirms
their contention. Where the question is one of
fact and the evidence is admittedly “contradictory on many points,” the
findings of fact by the trial judge cannot lightly be disturbed. Counsel for
the appellant in discussing the evidence complain that in their view the
learned trial judge rejected as a whole the evidence adduced by the experts and
improperly declined to accept the evidence of the appellant’s expert witnesses;
improperly, they say, because in their opinion the expert evidence on behalf of
the appellant was consistent and the expert evidence on behalf of the
respondent disclosed contradictory theories. There were three expert witnesses
called by the respondent and four by the appellant. The evidence of all these
witnesses
[Page 14]
was largely theoretical and we could quite
appreciate the trial judge, if he had done so, disregarding such evidence and
seeking a solution of the problem before him in the evidence of about one
hundred lay witnesses who told from their own actual experiences and
observations over a period of many years of the action of the St. Francis river
at the time of spring floods and of the carrying off of the ice jams at the end
of the winter seasons. But in point of fact the trial judge did not disregard
the evidence of the expert witnesses. He has in his judgment carefully reviewed
the evidence of these witnesses, taking first the expert evidence on one side
and then the expert evidence on the other side. Having done that, he says that
he found himself in a certain state of perplexity not only because the evidence
of all the witnesses consisted largely in statements of theory but because
these witnesses differed fundamentally among themselves. It was then that the
trial judge turned to the evidence of the lay witnesses for an appreciation of
the real facts in the case. Counsel for the appellant contend that a case of
this nature should be determined largely upon evidence of witnesses who speak
from certain precise data and known principles of science and that it is upon
such evidence and not upon evidence of laymen who have not at their command
such data or scientific knowledge that such a question as is involved in this
action should be determined. In my view the trial judge approached the
evidence, and I think rightly, in this manner: Having carefully reviewed and
considered the evidence of all the expert witnesses and finding marked
differences of opinion among them, he turned to the great mass of lay evidence
and then accepted the theory of those experts that was consistent with the
evidence of those lay witnesses whose evidence he accepted because of their
practical experience and credibility. It is plain that the trial judge was much
impressed with the evidence of one Mercure. Mercure lived for nearly fifty
years in Drummondville alongside the river between the locations of the
Drummondville dam and of the Hemmings falls dam. He had driven lumber down the
river every spring for about forty years. He had a wide experience on the St.
Francis river, at least in the section of it with which we are concerned. He
had known the river in its different conditions, first in a state of nature,
then with
[Page 15]
the dam that the town of Drummondville erected
in 1896, later with the dam the appellant built in 1918 replacing the wooden
dam that the town had built in 1896, and finally with the large dam and power
house built across the river at Hemmings falls by the appellant in 1925. The
result of his evidence was that before the dam at Hemmings falls was built
there had never been floods as considerable as the one of 1928 and that there
had never been ice jams of the size of those which had formed since the
construction of that dam. He stated that prior to the erection of the dam and
power house in 1925 there were rapids with a drop of over thirty feet and that
ice very seldom formed in those rapids and that, when it did, it was not solid.
He said that the long and wide basin of deep and still water created by the dam
upstream a distance of about five and a half miles was an ideal “vessel,” to
use his expression, for the formation of ice and the accumulation of frazil.
Mercure had been accustomed, prior to the construction of the dam, to place
logs during the winter months on the slope of the river bank to be taken away
in the spring, and he said that if he had done the same in 1928 the logs would
have been covered with at least twenty feet of ice. I quote the words of the
trial judge:
Mercure is not expounding theories, but
relating facts whereof he has been witness. He has rafted logs on the St.
Francis river since 1885; he knows all the holes and nooks in the river; he has
seen the river in its natural state and also since it has been dammed at
Drummondville and later at Hemmings falls; he witnessed all the ice break-ups
and spring floods for over forty-five years and always took a keen interest in
them, as every spring he was waiting for the river to get clear to start
floating his logs. I believe his testimony is of great value to the Court * * *
he impressed me as being frank and honest and I have no reason not to believe
his testimony. Besides, Mercure is corroborated by a number of witnesses,
particularly with respect to the greater seriousness of the floods and jams
since the construction of the Hemmings falls dam and the fact that, prior to
such construction, the ice below the Dauphinais rapids always left in the
spring before the ice from upstream arrived.
The trial judge then directs attention in his
judgment to particular portions of the evidence of thirteen witnesses in
corroboration generally of Mercure’s evidence, and concluded that he saw no
reason to believe that the ice and water running down normally in the river in
a state of nature, though somewhat more abundant than in previous years as a
result of persistently mild weather, would have been sufficient to damage the
railway embankment. That
[Page 16]
conclusion was reached after a careful review of
all the evidence of both the expert and the lay witnesses, and is a conclusion
that agrees entirely with the evidence of the expert witness, McLaghlan.
McLaghlan is an hydraulic engineer who has been employed by the Department of
Railways and Canals since 1907. He made a special study of the St. Francis river during the two months
prior to the trial of the action. Asked directly,
What is the cause of this washout suffered
by the railway at Drummondville on the 8th April, 1928?
he answered:
The accident to the Canadian National
Railway was brought about by the state of the Hemmings falls dam without
question. The building of that dam caused the jam to occur at a point it would
not occur in nature. That jam was of such a nature that the people operating
that plant could not control it, and it broke and went away at a time which
shows itself the nature of the force on it.
And again he says:
That jam was caused by the dam, and the
impounding of the water was caused by the jam, all attributable to the building
of the Hemmings falls dam. Why? Because that Hemmings falls dam transferred a
jam from below the rapids where it impounded practically nothing to a point
upstream where it impounded an enormous quantity of water.
* * *
That excess flow was caused by the jam,
suddenly breaking; the jam itself was caused by the building of the Hemmings
falls dam where it is * * * The whole accident is traceable directly to
interfering with nature by building the Hemmings falls dam at a point which was
not suitable to stowing the ice that comes out of that river in the break-up period.
Upon the evidence the learned trial judge said
he could reach no other conclusion than that the dam at Hemmings falls was
responsible for the washout of the railway embankment at Drummondville. But
counsel for the appellant argue that it was not fair for the trial judge to
accept the evidence of Mercure in that he had a personal interest in the claim
the Mercure Company had against the appellant for damages resulting from the
floods of 1927 and 1928 and had assisted financially or otherwise in support of
two other claims against the appellant, and was therefore vitally interested in
this litigation. That was undoubtedly something that had to be seriously
considered by the learned trial judge in weighing the evidence of Mercure. It
was a powerful basis of attack by the appellant upon the whole evidence of
Mercure but the trial judge saw and heard the witness and was told the facts
upon which the alleged bias
[Page 17]
of the witness was asserted and notwithstanding
this the trial judge said:
I do not think that this can in the least
affect the credibility of the witness; he impressed me as being frank and
honest and I have no reason not to believe his testimony.
It seems to me quite impossible for us upon an
appeal, accepting as we should the learned trial judge’s view of the
credibility of witnesses and his findings of fact on evidence that was
admittedly contradictory both on theories and on facts, to set aside the
finding made by the trial judge upon the main issue unless it is abundantly
plain that he was obviously wrong in his conclusion. Not only do I think that
there is nothing substantial to satisfy us that the trial judge was wrong but I
think his conclusion was right.
Much stress was laid by counsel for the
appellant upon their contention that having regard to the combination of
abnormal natural forces it was really a case of vis major or damnum
fatale. Great quantities of ice formed during the severe winter; heavy
rainfall and high temperature followed in the spring; all of which were said to
have constituted a combination of natural forces so unprecedented and beyond
the control of the appellant as to relieve it of any liability. But all the
evidence on this view of the action was carefully considered by the trial
judge. This question involved a consideration of the evidence of other somewhat
similar floods and ice jams in the St. Francis river at the same location in
other years, particularly in 1887, 1913, 1915 and 1921, and a great deal of
evidence was directed to these events, before the construction of the Hemmings
falls dam, and to the severe flood and break-up in 1927 after the construction
of the dam. Evidence was also given about the flood of 1932 (the accident in
question in this case was in 1928). The trial judge was satisfied on the evidence
that the three worst floods in the section of the river with which we are
concerned were those of 1927, 1928 and 1932, and that the floods in 1887, 1915
and 1921 were lesser floods, and he found it difficult to think that this was a
mere coincidence. I again quote the exact words of the trial judge:
I am convinced that these dams,
particularly and to a much greater extent the dam at Hemmings falls, had the
effect of facilitating and increasing the formation of sheet ice and the
accumulation of broken ice and frazil underneath or behind it. The five and a
half mile basin above Hemmings falls dam impounded enormous quantities of
water, ice and frazil. Such a state of affairs is unquestionably conducive to
the formation
[Page 18]
of ice jams of large proportion. Jams may
have formed at the foot of Hemmings falls rapids prior to the construction of
the dam, but in no wise comparable to those which formed upstream after the dam
was erected. And I am satisfied that a jam formed at the foot of the Hemmings falls
rapids, under natural conditions, would have gone down during the break-up
period in an open river, before any ice jams at Labonté’s,
at Dauphinais’, at Ulverton rapids, at Richmond or at
any other place upstream would have reached the Hemmings falls rapids, as it
has been asserted by several witnesses, all of them well acquainted with the
behaviour of the river prior to the construction of the dam.
That there was a combination in the spring of
1928 of natural forces of an unusual nature is apparent from the evidence but
that does not, as a matter of law, entitle the situation to be treated at damnum
fatale or vis major. In the House of Lords in Greenock
Corporation v. Caledonian Railway,
referred to by the learned trial judge in his judgment, it is laid down to be
the duty of any one who interferes with the course of a stream to see that the
works which he substitutes for the channel provided by nature are adequate to
carry off the water brought down even by extraordinary rainfall, and if damage
results from the deficiency of the substitute which he has provided for the
natural channel he will be liable. In that case a municipal authority, in
laying out a park, constructed a concrete paddling pond for children in the bed
of a stream and altered the course of the stream and obstructed the natural
flow of water therefrom. Owing to a rainfall of extraordinary violence the
stream overflowed at the pond, and, as the result of the operations of the
authority, a great volume of water, which would have been carried off by the
stream in its natural course without mischief, poured down a public street into
the town and damaged the property of two railway companies. It was held that
the extraordinary rainfall was not a damnum fatale which absolved the
authority from responsibility, and that they were liable in damages to the
railway companies. Lord Dunedin there quotes with approval the language of Lord
Westbury, L.C., in Tennent v. Earl of Glasgow,
If anything be done by an individual which
interferes with natural occurrences, such as, for example, in Lord Orkney’s case, throwing a dam across the course of a
stream, it is undoubtedly the duty of that individual so to construct the work
as to provide in an efficient manner, not only against usual occurrences and
ordinary state of things, but also to provide against things which are unusual
and extraordinary.
[Page 19]
The Greenock case was a Scottish case but we find Lord
Haldane in the House of Lords in the English case of Attorney-General and
others v. Cory Brothers and Company Limited referring to the Greenock case
in these words:
The rainfall proved to have occurred at the
period of the slide was no doubt unusually heavy, but it was of no unique
character, nor of such as ought not to have been foreseen as possible. It could
not be contended that it amounted to an “act of God,” to what is called in the
jurisprudence of Scotland, a damnum fatale. Indeed, were your Lordships
inclined to take a different view, you would be precluded from doing so by the
judgment of this House in the recent case of Greenock Corporation v. Caledonian
Railway Co..
The Greenock case was
subsequently referred to in the Privy Council in a Quebec case, Montreal
City v. Watt and Scott Limited,
in the judgment delivered by Lord Dunedin.
The evidence in this case, tested by the
standard laid down in the Greenock v. Caledonian Railway case,
was held by the learned trial judge not to constitute a damnum fatale or
vis major and so relieve the appellant from liability. In that view of
the evidence I entirely agree.
Then it was argued by counsel for the appellant
that, in any event, the washout of the railway embankment was really due to the
fault of the railway company itself in continuing to use the old gravel
embankment instead of replacing it with a substantial modern structure, and it
was suggested that if the alleged negligence of the railway company did not
constitute a complete defence to the action, it at least constituted
contributory negligence and would involve an apportionment between the parties
of the amount of damages sustained. It is plain that the law of Quebec, unlike
the law of England, as was admitted in Canadian Pacific Railway Co. v. Fréchette, and referred to by Lord Dunedin in the
concluding paragraph of his judgment in the Privy Council in the City of
Montreal case, enjoins apportionment of the damage
where there has been a negligence of the plaintiff contributing to the accident
and their Lordships in the Privy Council in the City of Montreal
case agreed that the doctrine is applicable to modify a liability established
by article 1054 of
[Page 20]
the Civil Code. But this action is not founded,
except incidentally as to the use of some dynamite and the operation of the
gates in the spillway, upon the ground of negligence; it is in substance a case
of nuisance. I cannot think that if what I have upon my property has adequately
served my purpose for fifty years or more there is any duty in law upon me to
protect it against what may be the result of the establishment and maintenance
of a nuisance created by my neighbour upon his land. As between the owner of a
dam and other persons, it may not be a question of negligence in construction
or operation of the dam but the fact of the interference with the natural level
and flow of the river caused by the obstruction in the river, that may give
rise to a liability to the other persons to whom a duty lies not to interfere
with the natural level and flow of the river, notwithstanding that there be no
negligence in the actual construction or operation of the dam. Of course if
statutory power is given to construct the works without reserving any remedy to
private persons adversely affected, that is a different case as was pointed out
by Lord Macnaghten in East Fremantle Corp. v. Annois.
Quite apart from the question of law, the fact
is that the railway embankment had withstood all the spring floods and
break-ups since the time it was built in 1887. The section of the railway line
where the embankment was located was inspected daily by the railway as to the
state of repair and the evidence satisfied the trial judge that the embankment
was in good condition at the time the accident occurred. It undoubtedly would
have been an act of wisdom, in the light of what happened, for the railway company
to have discarded this old gravel embankment and substituted for it a
substantial modern structure for carrying the tracks between the bridge and the
viaduct over the highway. But if, as it has been found, the embankment was
washed away by conditions which directly resulted from the obstruction in the
river of the appellant’s dam and power house, it is no answer to the respondent’s
claim for the damage to the embankment that the railway might have constructed
something so substantial at that point as to withstand the force of the ice jam
on the day of the accident. When the appellant undertook the construction
[Page 21]
and maintenance of its works in and across the
St. Francis river, it is not disputed that it had lawful governmental authority
to do so. But it took that authority subject to the obligation of becoming
responsible for all damages that might result therefrom to any person. That is
the effect of sec. 12 of the Quebec Water-Course Act, which I have set
out above. It was argued that the words in that section, “whether by excessive
elevation of the flood-gates or otherwise,” only refer to damage that may occur
upstream and not to damage that may occur downstream and that the words “or
otherwise” should be confined to such things as flood-gates. But in my view
that is too narrow an interpretation to put upon the section. It seems to me
plain that the legislature intended that the words “all damages resulting
therefrom to any person” should embrace damages whether they occur above or
below the obstruction in the river that result from any of the works of the
owner or lessee. It is true that the appellant was put by the statute into the
position of being able lawfully to construct, maintain and operate its works
but only under the condition subsequent that it should, notwithstanding that
there was no injuria, pay, under a liability imposed by the statute, for the damnum
which should from time to time prove to have been occasioned to any person
therefrom.
A case against the appellant was incidentally attempted
to be made on the ground of alleged negligence of the appellant in two
respects. One was the fact that the appellant exploded about 200 pounds of
thermite in the river on the morning of the day of the accident at a point some
distance upstream from the Hemmings falls dam with the object of relieving the
pressure. The other ground of alleged negligence was the manipulation of the
sluice-gates by the appellant during the day before as well as during the day
of the accident. Nothing much turned upon either of these complaints. The trial
judge found that the explosion of the thermite had very little effect. As to
the operation of the sluice-gates, he was inclined to think that the disaster
might have been averted had the appellant manipulated its sluice-gates in such
a manner as to lower the level of the water in the basin as much as possible by
opening the four gates wider from the time the weather turned decidedly mild
and the inflow increased (on Thursday preceding the
[Page 22]
Sunday of the accident) until after the final
break-up on Sunday afternoon. The appellant operated the gates to keep the
water at a certain level in order to use its turbines. But the trial judge
treated this matter as of little, if any, practical importance, because of the
conclusion he had reached that the dam itself, independently of the manner in
which the sluice-gates had been operated, had been responsible for the washout
of the embankment.
The amount of the claim for damages to the
embankment is not questioned by the appellant, if there be liability. Therefore
upon the grounds above stated I think the judgment must be sustained in respect
of the items in what I described in opening as the first of the three classes
of claims involved in the action. The first class as so described consists of
items D and E in paragraph 8 of the Information, which items aggregate
$18,259.04.
That brings us to a consideration of the items
in what I have described as the second class of claims, being the cost of
repairs to the locomotive and cars and the cost of auxiliary and wrecking train
service, diversion of train service, and special train service resulting from
the interruption to traffic on the railway line in the section in which the
embankment was located. These are items A, B, C, G, H and I, aggregating
$43,671.81. This branch of the case has given me a good deal of trouble. Almost
at the moment that the embankment was washed out, the passenger train reached
that point. Can liability properly be put upon the appellant for that portion of
the respondent’s damages that consisted in the destruction or damage of the
locomotive and the cars and in the cost necessarily involved in rearrangement
of train service? Is the liability for damage resulting from the construction
and maintenance of the works of the appellant confined to such damages as might
reasonably have been anticipated by the appellant? The authorities seem to
establish that when it is found that a man ought to have foreseen in a general
way consequences of a certain kind, it will not affect him to say that he could
not foresee the precise course or the full extent of the consequences which in
fact happened. If liability is once established by proof of the relation of
cause and effect, then under the authorities as I understand them those damages
that flow directly are recoverable.
[Page 23]
The appellant alleges, however, that it was the
respondent’s own fault that the train in question was permitted to reach the
point of the embankment at the time it did on the day in question, having
regard to the notice or knowledge which it is argued the respondent had of the
probability of the embankment being washed out that day. Emphasis is laid by
counsel for the appellant upon the fact proved in evidence that a day or two
before the accident the railway tracks at the village of Richmond, 25 miles
away from Drummondville, were all under water, traffic interrupted there and
the flood so great as to put the railway upon its guard against great ice jams
and flood waters reaching the railway bridge with great force within a day or
two and the probability of the washout that actually happened. Further it is
argued that the respondent knew of the weakness of its gravel embankment to
withstand a spring break-up of the extent that existed at that time. Much was
made in the argument before us of a cavity in the embankment shewn on a
photograph put in at the trial. Further it was argued that the respondent’s
railway officials at Drummondville should have been alert at least an hour or so before the embankment
was washed out, and have given the train ample signals not to proceed across
the St. Francis river unless satisfied that there was no danger. During the
argument I was rather impressed with these contentions and I have given them
anxious consideration. The destruction of the embankment itself was one thing.
The damage to the locomotive and cars stands on a different footing. It is
difficult to see how the loss of the embankment could have been avoided but it
is not unreasonable to suggest that the train might have been stopped before it
reached the point of the calamity. The trial judge carefully considered the
facts upon which this contention was based and after all it is a question of
fact. As to notice and knowledge of the respondent at Richmond, it seems to me
that Richmond being 25 miles away it is too much to impose upon the respondent
that the railway agents or servants at Richmond should have anticipated what
actually happened a day or two later at the railway bridge at Drummondville.
Those in charge of the power house and dam of the appellant at Hemmings falls
were sufficiently alert to the existence of the ice jam and its probable
movements
[Page 24]
the very day of the accident to go upstream and
explode two hundred pounds of thermite at two different places in the basin,
and if they had themselves expected that the railway embankment only two and a
half miles downstream from the dam might be washed out, they undoubtedly would
have notified the respondent’s representative at Drummondville to be on guard.
They did not foresee what actually happened and no blame is attached to them
for not foreseeing the danger at the railway bridge and I cannot see that we
would be justified in attaching blame to the officials of the respondent at
Richmond 25 miles or more away.
Then as to the cavity in the embankment, shewn in the photograph, as indicating
the knowledge that the railway had or ought to have had of the risk of the
embankment being carried away in any severe breakup. The evidence as to this
photograph was all carefully considered by the trial judge. The photograph was
taken in 1918, ten years before the accident, by an engineer named Dick of the
contracting firm of Morrow & Beatty which was at that time engaged in
building the appellant’s first dam and power house at Drummondville—the dam
that replaced the town’s wooden dam in 1918 almost 1,100 feet from the bridge.
Dick said the photograph was taken a day or two after the break-up of that year
had occurred. It shews a cavity near the end of the embankment on the west side
of the river looking from upstream. Dick was unable to give the dimensions of
the cavity but a witness named Toupin said he saw the cavity in question, that
it was about five feet long by two feet wide and that it seemed bigger on the
photograph than it really was. In the opinion of Toupin, who had been a section
foreman for the respondent, the cavity did not affect the solidity of the
embankment. He said repairs were made three or four months later and it was the
only cavity he had ever noticed. The trial judge inclined to the view that the
cavity did not have as much importance as the witness Dick was disposed to
ascribe to it and the trial judge was not convinced that the cavity was caused
exclusively by the action of ice and water, but that the continual use of this
part of the embankment by people desiring to go to the river may have been the
origin of a hole in the embankment and once the surface had been broken it
would take less and less force and time to wear
[Page 25]
away the inner part of the gravel embankment.
This being the view of the trial judge on the evidence as to the cavity that
temporarily existed in 1918, it would be difficult for us to impute to the
respondent any blame arising out of this incident. Then as to the failure of
the officials of the respondent in the immediate vicinity of Drummondville to
warn the oncoming train, there is no evidence to shew that any official of the
respondent at or near Drummondville had any such notice or knowledge of the
probability of the washout occurring as to put the blame for the destruction or
damage to the locomotive and the cars upon the respondent itself.
The quantum of damages not being questioned in
the appeal, the judgment in so far as it relates to the second class of items
in the claim must for the reasons above stated, be affirmed.
Then as to the items of damages which I
described for convenience as the third class, being items under F. in paragraph
8 of the Information, aggregating $18,992.35. These items consist of actual
payments made by the railway for medical and hospital services, funeral and
ambulance expenses, indemnities to passengers and to employees, compensation to
the heirs of employees who were killed, wages paid to the disabled conductor,
and a grant of $600 to the woman who flagged the oncoming train. All these
items were allowed, except the $600 item for flagging the train. Now the
railway was not an insurer of the lives of either its passengers or its
employees. If it was the negligence of the railway company that caused the
personal injuries or death of some of the passengers and employees on the
train, the respondent could not succeed in the action. The whole case was
brought by the respondent upon the basis that the appellant’s works in the
river had been the direct cause of the accident and that being so the
respondent became under no legal obligation to either the passengers or
employees on the train. The railway made these substantial payments as
compassionate allowances on its part if its position in this action as to the
liability of the appellant is right. These payments were made without any
litigation between the parties and without any notice to or knowledge by the
appellant. The respondent
[Page 26]
has not made out a case for these payments within
article 1141 C.C. or established any agency, and these items in the claim
cannot be allowed. They were allowed by the learned trial judge at $18,992.35
and the total amount of the judgment directed to be entered by the learned
judge against the appellant in the sum of $80,923.20 must be reduced by the
said sum of $18,992.35.
I would vary the judgment appealed from by
reducing the amount thereof by the said sum of $18,992.35 and would allow the
appellant its costs of this appeal.
Cannon J.—The facts that gave rise to this litigation are amply set forth
in the very carefully prepared notes of my brother Davis. I feel that I should
explain how I have reached a conclusion under the laws of Quebec, which are
found in the following articles of the code:
Of
real servitudes.
General
provisions.
499. A real servitude is a charge imposed
on one real estate for the benefit of another belonging to a different
proprietor.
500. It arises either from the natural
position of the property, or from the law, or it is established by the act of
man.
501. Lands on a lower level are subject
towards those on a higher level to receive such waters as flow from the latter
naturally and without the agency of man.
The proprietor of the lower land cannot;
raise any dam to prevent this flow. The proprietor of the higher land can do
nothing to aggravate the servitude of the lower land.
503. He whose land borders on a running
stream, not forming part of the public domain, may make use of it as it passes,
for the utility of his land, but in such manner as not to prevent the exercise
of the same right by those to whom it belongs; saving the provisions contained
in chapter 51 of the Consolidated Statutes for Lower Canada, or other special
enactments.
He whose land is crossed by such stream may
use it within the whole space of its course through the property, but subject
to the obligation of allowing it to take its usual course when it leaves his
land.
508. The law subjects proprietors to
different obligations with regard to one another independently of any
stipulation.
Chapter 51 of the Consolidated Statutes for
Lower Canada, which was originally enacted as 19-20 Vict., ch. 104, and is now
found in ch. 46 of the Revised Statutes of Quebec (1925), gives to the riparian
owner the right to erect dams to utilize the stream but provides that such
owner of any such works shall be liable for all damages resulting therefrom to
any person, whether by excessive elevation of the flood gates or otherwise.
[Page 27]
In Jean v. Gauthier, the
Court of Review, composed of Stuart, Casault and Caron, JJ., considered the
effect of this amendment to the common law, which the late Chief Justice
Casault explains as follows:
Avant le 1er juillet 1856, l’emploi comme
pouvoir moteur des rivières et des cours d’eau n’était permis aux propriétaires
riverains qu’à la condition de ne faire aucun dommage aux propriétés voisines.
Si les chaussées, les écluses ou les digues requises pour obtenir d’un pouvoir
d’eau la force motrice nécessaire pour exploiter un moulin, une manufacture ou
une usine faisaient déborder les eaux sur les propriétés voisines, ou y
causaient d’autres dommages, celui qui les avait construites sur sa propriété
avait violé la règle de droit qui met à la jouissance de sa chose la condition
qu’il ne fera pas tort à celle du voisin.
Aussi le propriétaire du terrain qui souffrait
de ces constructions avait, outre le droit de recouvrer les dommages qu’elles
lui causaient, celui de les faire changer, et même détruire, quand la
destruction seule pouvait mettre fin au tort qu’il en souffrait. A cette date,
la législature a rendu licite ce qui ne l’était pas auparavant, et a permis,
comme l’exercice d’un droit, ce qui jusque-là était la violation du droit d’autrui.
L’acte 19-20 Vict., 104 (S.R.B.C. 51) a permis au propriétaire l’exploitation
des cours d’eau sur sa propriété, en y construisant des usines, moulins et
manufactures, et l’érection dans le cours d’eau, pour cette fin, de chaussées,
digues, écluses et autres travaux; il n’a réservé aux propriétaires voisins qui
en pourraient souffrir que le droit à une indemnité, et ne leur a conservé
celui de demander la démolition des travaux que comme accessoire du premier,
savoir, dans le cas seul où la compensation ne serait pas payée. C’est une
servitude légale qu’a créée cette loi, servitude analogue à celle de
mitoyenneté entre propriétés voisines, et à celle du passage pour l’enclave.
Les dommages et les indemnités que réserve la
loi n’ont pas un caractère autre que le prix qu’est obligé de payer, pour la
partie du terrain et du mur qui y est assis, le voisin qui veut en acquérir la
mitoyenneté, ou que la valeur du terrain que l’enclavé veut affecter à son
passage.
* * *
Mais, entre le propriétaire des travaux et
celui de l’héritage qui en souffre, dommages signifient indemnité pour
la détérioration que les constructions font subir à son bien. Cette
indemnité ne peut par conséquent être demandée que par le propriétaire du fonds
que la loi a fait servant à celui du fonds qu’elle a fait dominant, ou par
celui de l’héritage détérioré à celui des travaux qui le détériorent.
In Breakey v. Carter,
Casault, J., referred to Jean v. Gauthier and
said:
J’ajouterai, comme je l’ai fait dans cette
cause de Jean v. Gauthier, qu’il ne peut y avoir
ni délit ni quasi-délit dans l’exercice d’un droit, et que le recours pour le
prix de son obtention, ou pour Yindemnité que doit payer pour son
exercice le propriétaire du fonds dominant au fonds servant n’est pas soumis à
la prescription de deux ans à laquelle le code (art. 2261) soumet le recours
pour dommages résultat de délits ou de quasi-délits.
This case of Breakey v. Carter
came before this court which confirmed the opinion of Casault, J., that that
chapter
[Page 28]
51 of the Consolidated Statutes of Lower Canada
recognizes the right of a proprietor to erect works which may have the effect
of damming back the water on a neighbouring property, the construction of a dam
having that effect, could not be considered a quasi-délit, but rather as
a right of servitude which gave to him who was injured by it a legal recourse
for indemnity for the damage. (Cassel’s digest, p. 464, 12th May, 1885).
In Gale v. Bureau, the present Chief Justice said, at p.
312:
The effect of that decision (by which this Court is bound) is that the
right given by article 7295 (or the then Revised Statutes of Quebec), in so far
as it justifies the penning back the waters of a stream upon the upper riparian
proprietors, is to be regarded as a right of servitude to which is attached an
obligation to indemnify the proprietor who is prejudiced by the exercise of it.
Another case, Proulx v. Tremblay, dealing with damages caused by the
erection and operation of a dam to a proprietor below the dam may be considered
as helpful to apply the provisions of the statutes to the present case where
the damages claimed were caused by the respondent railway’s embankment situate
at some distance below the appellant’s dams. Sir L. N.
Casault says at p. 358:
Il n’est pas douteux que
cette disposition statutaire (S.R.B.C. ch. 51) a fait légal ce qui
auparavant était illégal, et a permis de faire des eaux
courantes un usage que le droit antérieur n’autorisait pas et une appropriation
qu’il prohibait. Avant la passation de ce statut, le propriétaire inférieur eut
pu forcer celui du fonds supérieur à enlever les barrages et les obstacles qui
empêchaient les eaux communes d’arriver librement à son fonds. Quelles qu’utiles
qu’eussent pu être, pour le propriétaire supérieur ou même pour le public, les
usines ou les machines que ces barrages servaient à alimenter et à mettre en
mouvement, le propriétaire du fonds inférieur ou supérieur n’était pas obligé d’en
subir les inconvénients si petits qu’ils fussent; il pouvait exiger leur
destruction. Cette loi ne leur a permis d’obtenir la démolition des ouvrages,
qui retenaient les eaux sur les cours d’eau pour les besoins d’une usine ou d’une
manufacture quelconque, que lorsque l’usinier ou le manufacturier négligeait l’accomplissement
de la condition qu’elle mettait à l’exercice du privilège qu’elle conférait.
Cette condition était le paiement des dommages que pouvait causer à autrui l’usage
que faisait de l’eau le propriétaire des machines qu’elle servait. Elle est
écrite à la section 2 de l’acte
comme suit:
Sect. 2. Les
propriétaires ou fermiers des dits établissements resteront garants de tous
dommages qui pourront en résulter ou être causés à autrui, soit par la trop
grande élévation des écluses ou autrement.
Cette dernière expression, ou autrement, ne
laisse aucun recours à
[Page 29]
découvert, elle les comprend tous; et met
aussi bien à couvert le dommage que peut causer la rétention de l’eau que celui
qui résulte de son extension ou épanchement sur les propriétés voisines. Elle
empêche la restriction aux dommages causés par la trop grande élévation des
écluses des droits qu’elle sauvegarde, lors même que cette mention spéciale ne
serait par là simplement pour exemple et qu’elle aurait une tendance limitative
et exclusive qu’elle n’a pas.
* * *
J’ai déjà, dans la cause de Jean v. Gauthier,
exprimé l’opinion que le statut 19-20
Vict., ch. 104, avait créé une servitude qui, comme toutes les servitudes légales qui s’acquièrent,
ne peut s’exercer qu’en en payant le prix. Le défendeur ne peut appuyer que sur
ce statut ou mieux celui qui le refond, le droit qu’il invoque de retenir pour
les besoins de son moulin les eaux de la rivière Giasson; c’est là l’exercice
de la servitude qu’a créée cette loi, il ne peut pas l’exercer au détriment des
fonds servants sans leur payer l’indemnité qui en est le prix. Cette indemnité
est pour le demandeur la valeur des dommages que lui cause la rétention de l’eau.
In the same case of Proulx v. Tremblay, Stuart, J., while agreeing with the views
of Casault, J., that, before the passing of the statute, a dam could not legally
be placed across rivers to retain the waters, goes even further, when he says:
The claim for damages must rest, not upon
the act of erecting the dam, but upon its improper construction and the abuse
of the licence which the law gave him.
* * *
The law of servitudes must necessarily
affect the decision of a case like this, and may properly be referred to.
* * *
The plaintiff in this case is proprietor of
the land on the lower level which is subject to the servitude of receiving such
waters as flow from the land of the defendant which is on the higher land,
naturally and without the agency of man. He complains not that the defendant
aggravates his servitude, but that he arrest the flow for a time, by means of a
dam established for his own utility. The prohibition which existed at common
law to construct a dam attached to the proprietor of the lower level,
not to the proprietor of the higher level. And the reason is manifest in the
text. The certain result of a dam is to raise the level of the river and to cause
a reflow of the waters upon the lands of all those above it, but it in no way
aggravates the servitude to which is subject the land of the lower level. Even
under the old law the plaintiff would not rest this action upon article 501,
and would have to show a special damage irrespective of any falling within the
purview of this servitude.
The preamble of the statute invoked shews
it to have been called for by considerations of public expediency. “Vu que l’exploitation des
“cours d’eau serait un grand moyen
de prospérité pour le pays.” 19 and
20 Vict., ch. 104, 1856. Its public design cannot be overlooked in its
interpretation, and the interests of the country at large must prevail over
private interests.
[Page 30]
These views are discussed by Mignault, in “Droit
Civil,” vol. 3, pp. 25 and 26, and he concludes as follows:
Je crois que le législateur a voulu préserver les droits en limitant toutefois le
recours des autres riverains au paiement des dommages qu’il a pu éprouver.
From the perusal of the above authorities, it
seems to me abundantly clear that the damages contemplated by the statute are
those suffered by any person as riparian owner, either below or above the dam
and would be limited to the actual damages caused to the owner of a riparian
piece of land as a result of the construction and maintenance of the dam.
Although there is no direct evidence of title to the riparian lots on which the
embankment that was destroyed rested, I would assume that the Crown owns the
property, is a riparian owner and is bound to receive in its natural state the
waters after their use by the appellant for a purpose which must be considered
as of public interest.
The latter must be held responsible for the
damages to any property below the dam by the construction of its works.
Although the evidence is somewhat perplexing, I cannot reach the firm
conclusion that the trial judge was clearly wrong in his finding that the
natural conditions of the river were altered by the construction of the dam and
in his view that the ice jam which caused the enormous accumulation of water
resulted from the longer, wider and deeper basin created by the appellant. The
latter would, therefore, be responsible for the damages caused by the injury to
the physical property of the riparian owner; but this would not include the
locomotive and rolling stock which happened to reach the site of the embankment
shortly after the accident.
The codifiers inserted the reference to chapter
51 of the Consolidated Statutes of Lower Canada (now embodied in chapter 46 of
the Revised Statutes of Quebec) in title 4 of the Civil Code dealing with real
servitudes and in its first chapter dealing with “servitudes which arise from
the situation of property.”
The obligation to indemnify would, under the
statute, result from the sole and direct operation of law and would
[Page 31]
be one of the obligations described in article
1057 C.C. See on this point the learned discussion by Sir Henry Strong, C.J.,
in City of Quebec v. The Queen.
The statutory liability cannot be extended
beyond what the law has fixed as the price of the servitude on riparian owners,
viz. the damage caused to the owner of any property by the damming of the
waters. I would, therefore, award the cost of reconstructing the embankment and
the railway track. I would also allow the cost of the temporary railway service
during the necessary period of repairs to the embankment and railway track.
This cost of maintaining the service may fairly be considered as a damage
occasioned to the enjoyment of the right of the respondent as riparian owner.
See City of Quebec v. Bastien.
The respondent also alleged two grounds of
special negligence: the use of thermite to break the jam and the opening of the
sluice gates which would have started the movement of a tremendous volume of
ice and water washing out the railway embankment. The trial judge found that
the explosions of the two cans of thermite did not have such effect. He does
not find that the respondent’s complaint about the opening of the sluice gates
is well founded; on the contrary, he says that the four gates should have been
opened wider in order to lower the level of the water in the basin.
These findings would eliminate the recovery of
damages under article 1053 C.C. Article 1054 does not apply for the reasons
given above. The water and ice were not legally under the care nor under the
control of the appellant; the latter were in duty bound to restore it to its
normal course down the St. Francis river; they are responsible for the mischief
if the abnormal flow of the river when it reached the embankment can be traced
back to the presence of the dam across the river 2½ miles above.
Pothier (éd. Bugnet) IV, p. 330, may be quoted:
235. Le voisinage oblige les voisins à user chacun de son
héritage, de manière qu’il ne nuise pas à son voisin: Domun suam unicuique
reficere licet, dummodò non officiât invito alteri, in quo jus non habet: L. 61, ff. de Reg. jur.
Cette règle doit s’entendre en ce sens, que,
quelque liberté qu’un chacun ait de faire ce que bon lui semble sur son
héritage, il n’y peut faire rien d’où il puisse parvenir quelque chose sur l’héritage
voisin, qui
[Page 32]
lui soit nuisible; In suo hactenus jacere licet quatenus
nihil in alienum immittat; L. 8 §5, ff. Si serv. vind.
236. C’est sur ce
principe qu’est fondée l’action aquœ pluviœ arcendœ.
Il y a lieu à cette action de la part du
propriétaire ou possesseur du champ inférieur contre son voisin propriétaire ou
possesseur du champ supérieur, lorsque le possesseur du champ supérieur, par le
moyen de quelque ouvrage qu’il a fait dans son champ, rassemble les eaux qui y
tombent, d’où il les fait tomber dans le champ inférieur avec plus d’abondance
et de rapidité qu’elles n’y tomberaient naturellement, et lui cause par ce
moyen quelque dommage.
Mais lorsque c’est naturellement que les eaux
tombent du champ supérieur dans le champ inférieur, le possesseur du champ
inférieur ne peut pas s’en plaindre; car ce n’est pas en ce cas le possesseur
du champ supérieur qui les y fait tomber, c’est le nature des lieux: Si aqua naturaliter decurrat, actionem cessare; L. 1, § 10, ff. de Aqu.
et aq. Non aqua, sed loci natura nocet; eâd. L., § 14.
which would show that the only remaining ground
in the Crown’s case is not “faute” or negligence, but a breach of the
duty imposed by the law, or in the nature of a quasi-contract, namely, the duty
which is imposed upon the owner of the superior heritage, who executes works on
his land or alters its natural state, to indemnify the owner of an inferior
property if any damage should be caused by such works.
Moreover, the damages to the train equipment did
not flow solely and necessarily from the presence of the dam in the river;
other agencies intervened to cause this result, which, in my opinion, could and
should have been avoided by the railway. The employees in charge did not show
the zeal and diligence to be expected under the abnormal conditions facing
them, as well as all proprietors along the St. Francis
river, on that Sunday afternoon. I agree on this point
with Dysart, J. ad hoc.
Even if the Crown had a recourse for repayment
of what was disbursed to pay the railway’s own debt for damages resulting from
bodily injuries to the victims of the accident (employees and passengers), I
believe that, under Regent Taxi & Transport Coy. v. Petits Frères
de Marie, any
action for bodily injuries caused by appellant’s negligence was prescribed when
brought on the 3rd of September, 1929, as to these special items. Art. 2262,
C.C.; art. 1056, C.C.
I would, therefore, allow the appeal in part,
with costs to the appellant, and restrict the recovery to the following items:
costs of repairs to tracks, $5,254.57; costs of repairs
[Page 33]
to structure, $13,004.47; costs of diversion of
train service and of special train service, $13,158.99, making a total of
$31,418.03 with interest from date of the judgment of the trial court and
costs.
The judgment of Crocket J. and Dysart J. ad
hoc was delivered by
Dysart J. ad hoc.—The conclusions at which I have arrived in this case are in
harmony, as they should be, with relevant Quebec jurisprudence as set forth in
the judgment of Cannon, J., but
while the conclusions harmonize, the considerations upon which they are founded
may be different.
We are all in accord that the appellant must be
held liable for some damages. The presence of the appellant’s dam in the St.
Francis river led directly to the washout of the respondent’s railway
embankment, and the appellant must, therefore, make compensation for all damage
directly attributable to the washout. The only question on which there is
difference of opinion is the extent of the damage for which compensation must
be made to the Crown as the owner of the railroad.
For my purpose, it will be convenient to divide
the claims of the railway company into four groups and to deal with the groups
seriatim.
The first group will consist of two items,—“cost
of repairs to tracks” ($5,254.57) and “cost of repairs to structure”
($13,004.47), a total of $18,259.04. These repairs were required in order to
bring the embankment and track back to the condition of passability in which
they were immediately before the washout, and do not include the permanent
improvements to the embankment which were subsequently made. I agree with both that the appellant
must pay this sum as compensation, because the damage is the direct and natural
result of the injuries to the embankment.
The second group of claims will include two
items covering “cost of diversion of train service” ($8,744.78) and “cost of
special train service” ($4,414.21), aggregating $13,158.99. I would hold the appellant responsible
for this group of damages. The evidence of the details of these
[Page 34]
items confirms what we had assumed, namely, that
these two items of cost were incurred in an attempt to overcome the interruption
to train service resulting from the destruction of the road bed,—an
interruption which would inevitably have followed from the washout even if the
train in question had not been wrecked. The washing away of the road bed by ice
and water completely severed the line of rail communication and stopped the
passage of all trains, resulting in an interruption which continued from
Sunday, April 8, at 4.45 p.m. until Saturday, April 13, at 7.30 p.m. Instead of
standing idly by until the necessary repairs could be made to permit of the
resumption of train traffic over the embankment, the railway officials acting
in the interest of all concerned—the public, the appellant and railway—provided
substitute train service, thereby avoiding, as it was their duty to avoid, some
of the loss which otherwise would have ensued. The substituted service took two
forms: (1) “through traffic” between the cities of Quebec and Montreal which
had previously been routed via the embankment, was diverted to another route,
(2) “local traffic” for a necessary distance on each side of the washout was
taken care of by a series of trains running to and from the washout. These
train services were in no wise connected with the loss of the train which went
down the embankment, and as I understand it, only that portion of the cost of
the services has been charged which might be considered an extra cost
occasioned by the washout.
The third group of claims includes items for “costs
of repairs” to the locomotive and to two cars ($27,236.20) and an item for “cost
of auxiliary and wrecking train service” ($3,276.62), a total of $30,512.82.
The appellant should not be held responsible for these costs. I should state
that my understanding of the facts in respect of these costs is that the
auxiliary and wrecking train service was necessitated by, and devoted to, the
recovery and removal of the damaged train, and not to the repair of the road
bed, and that, but for the damage to the train, this service would not have
been required. It is, therefore, so intimately associated with the damage to
the train as to be properly included in the groups of items covering repairs to
the train. This group of claims introduces a new link into
[Page 35]
the chain of causation and calls for some
extended comment. Here the conduct of the railway company must be taken into
account, because if by the exercise of reasonable precautions on its part, the
company which operates the railway could have avoided these damages, the Crown
can not now recover for them.
In order to determine what, if anything, the
railway employees should have done, we must look at the flood situation as it
developed and culminated in the washout. The evidence on this point presents
its own picture, the features of which should be noted. (1) Spring “breakups”
on the St. Francis river increased in violence after the erection of the dam at
Hemmings falls in 1924,—in fact, the railway’s case is based upon that fact;
(2) the natural conditions during the first week of April, 1928, were
particularly conducive to flooding and violent breakup,—unusually great
quantities of snow were melted very rapidly in the exceptionally warm weather
of that week, with the result that the river rose to almost unprecedented
heights; at Richmond, for instance, twenty-five miles up stream, the river
overflowed its banks and covered the railway yards and tracks to a depth of two
or three feet, so that men had to be assigned by railway officials to watch and
guard railway property at that place; (3) the swollen waters carried great masses
of broken ice, and during the two or three days preceding the washout, the
river for some miles above the dam was choked with millions of tons of ice; (4)
this enormous mass of ice and water, always growing in quantity, slowly forced
its way down the river, the ice grounding occasionally on ridges or shallows
and halting until an increasing height of water floated the mass and forced it
forward; (5) the forefront of the flood reached the broad basin immediately
above the dam on Saturday, April 7th, where its progress was delayed for many
hours by a large field of unbroken surface ice which covered that basin; (6)
the basin ice was eventually lifted by the swelling waters and broken up and
became part of the greater mass as that mass moved forward; (7) this final
break-up occurred on Sunday, the 8th, and the whole mass of many millions of
tons of ice and water rushed over the dam and down the river with terrific
force and violence, carrying
[Page 36]
away the embankment in its mad career; (8) for
some days prior to the washout, the local community was well aware of the
condition of the river, and many citizens were watching the progress of the
flood, and on Sunday, for several hours preceding the final burst, and during
its progress, hundreds of citizens lined the banks, watchful and expectant.
Although the railway company has, within a few hundred yards of the embankment,
a station at which it maintains a staff, its railway officials or employees do
not appear to have been on the scene. There is no suggestion that, at any time
during the several days preceding the washout nor during the final critical
hours, any steps were taken by them to safeguard the trains; (9) even when the
washing out process began—and it continued for some little time before finally
completed—the only person of all the throng to do anything effective in giving
warning to approaching trains was a lady, who, when she heard the distant
whistle of an approaching train, ran back along the track and flagged the train
in time to enable it to slow down, but not completely to stop; she saved much,
but not the engine and the two forward cars—these fell into the newly created
cavity.
Common knowledge of the conditions which had
been prevailing should have been sufficient to put railway officials on guard
as to the possibility—not to say probability—of danger to the embankment and
connecting bridge with all that such dangers entailed. The mere fact that the
power company’s employees did not call upon the railway employees to take
precautions does not of itself relieve the latter from performance of their
duty—nor mean that the need of precautions was not apparent. We may fairly
suppose the appellant’s employees were engrossed in trying to minimize the
flooding and to protect their own property, and that they naturally assumed
that the railway employees would look after the protection of railway property.
In all these circumstances, the failure of the railway employees to safeguard
the train was a failure in an obvious duty, and relieves the appellant from
responsibility for all damage resulting directly and indirectly from the
destruction of the train. This disposes of the third group of claims adversely
to the claimant.
[Page 37]
The fourth and final group of claims consists of
“payments” ($19,592.35) made by the railway company, for “medical and hospital
treatment,” for “ambulance and funeral expenses,” for “indemnities” to injured
passengers and employees, for “wages to disabled employees,” and for some
bounties. I fully agree that these claims cannot be allowed. My reason briefly
is that these payments were occasioned by circumstances surrounding the
wrecking of the train, and would not have been occasioned at all if the train
had not been wrecked. Moreover, the payments were made without established
legal obligation.
In the result, therefore, I would allow the
appeal to the extent, but only to the extent, of reducing the judgment of the
trial court to the sum of $31,418.03, on which interest should be allowed from
the date of that judgment. The appellant should have the costs of this appeal.
Appeal allowed in part with costs.
Solicitors for the appellant: Décary & Marier.
Solicitor for the respondent: L. E. Beaulieu.