Where a well, originally drilled in 1988, is re-entered in 1993 and drilling completed to a deeper zone resulting in the discovery of a new pool, 1988 drilling, completion, temporary access road and well site preparation costs, which originally qualified as CDE, will be eligible for reclassification under s. 66.1(9)(f) as CEE.